ContractPulse
Awarded

HRE - PJM/8 Clifton Hall Tunnel

£985,110

works

Contract Details

Tender Value
£985,110
Stage
Awarded
Published
Awarded

Timeline

Awarded
Disclosed
Start
End

Description

PJM/8 - Clifton Hall Tunnel, is situated in Swinton, Greater Manchester on the disused branch line that linked Patricroft with Molyneux Junction. The tunnel passes predominantly under residential housing and parkland aligned in a south-west to north-east direction. The double track tunnel, originally constructed in 1846, is 1187m long and lined with brick throughout. There are eight construction (blind) shafts along the length of the tunnel.

Related Contracts

From This Supplier

In This Category

Ref: 44c62796-4adf-4e48-8cf4-f16d02501198-765509 · Sourced from Contracts Finder

View source notice