Replacement Boilers at 3 Colham Road, Hillingdon
£72,668
Contract Details
- Tender Value
- £70,000
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
The London Borough of Hillingdon (LBH) intends to replace the boilers and control system at 3 Colham Road UB8 3UR. The Heating plant is located in three kitchens, North, South and East Wing, West Wing, external plant room. THE WORKS. The works shall include all of the works described within the specification documents (Part 1 & 2).This specification shall be read in conjunction with the Employers Requirements, schedules, supplementary documents and any drawing issued which defines the requirements of the proposed works to enable the Contractor to: a) Prepare and submit a proposal for the Works. b) Undertake construction and completion of the works. The Works include, but are not limited to the design, supply, installation, testing, commissioning and hand-over of a complete boiler system and the provision of certification, O&M Manuals and training to the Council's Representatives in charge of the schemes. *Site visits are mandatory, tenderer's that do not attend site on the specified date will not have their bids considered and will be rejected at the evaluation stage.*
Related Contracts
From This Buyer
From This Supplier
- VIVID - Kitchens & Bathrooms Supply & Install Framework
£950,000 ·
- 2023 - 1022 Structural Repair Works to Properties within Coventry and Birmingham - AWARD
£253,000 ·
- GB-Birmingham: Pioneer Group Electrical Testing and Remedial Works
£1,200,000 ·
- Replacement of Communal Boilers - Hatton Grove, West Drayton
£70,946 ·
Ref: 6751d3f8-a928-4d29-95cc-c72793902f5c-315807 · Sourced from Contracts Finder
View source notice