ContractPulse
Awarded

Endeavour Wharf Sheet Pile Remedial Works

£400,000

Scarborough Borough CouncilSouthbay Civil Engineering Ltd
works

Contract Details

Stage
Awarded
Published
Awarded

Timeline

Awarded
Start
Disclosed
End

Description

Endeavour Wharf is located on the west side of Whitby Harbour to the south of the swing bridge and consists of a 375m linear length of steel sheet piles. The wharf has been modified over the years and sections of sheet piling have been replaced and new sections added. However there remains two original sheet piled areas installed in the late 1950's, to the Northern end of the wharf approximately 26m in length and 142m at the Southern end. The remedial works relate to these two lengths of wharf frontage. The pile sections here have deteriorated over time and extensive corrosion particularly to the top of the piles has been recorded. To counteract this it is proposed to place mass concrete behind the sheet piling, followed by removal of the corroded sheet pilling along with other associated works detailed in the works information.

Related Contracts

Ref: c51ad9de-21c3-4d45-9a66-0cf2b21e7264-166407 · Sourced from Contracts Finder

View source notice