Tender notice

Replacement of the D12 and F2 Switchgear at Culham Science Centre

Notice details

Published
Category
works
Buyer region
South East

Tender valueNot disclosed

  1. Planned start
    As published in the notice
  2. Planned end
    As published in the notice

Work description

The majority of the equipment in the Culham West Main LV Distribution switchrooms D12 & F2 is approximately 60 years old and is long passed its intended design life.The scope includes but shall not be limited to: Replace the 60 years old English Electric LV ACBs in the switch panels with a retrofit withdrawable solution with equivalent Form 4 Type 7 ACBs in the two separate switchrooms in D12 and in the single switchroom in F2; The new ACBs must match the ratings from the obsolete ACBs and must provide like-for-like protection with adjustable settings; The retrofit solutions shall meet modern day safety standards; Introduction of intelligent monitoring of electrical loads; power demand and quality with real-time meter readings via networked PCs; and The retrofit solution must have a minimum lifetime of 25 years.

Related awards

Source: Contracts Finder · Notice 4321ccfc-f3ff-41b7-9ffa-f92af3a678fe-392836

View source notice