# Fit Out - Primary Steel Framework, Steel Sub Frames, Cladding Track, Firestops, Insulation, Retail Doors and Glazing -WP12\.4\.1 - Old Oak Common \(S4\) Station

> A sourced UK public sector contract award published by Balfour Beatty VINCI Systra JV.

## Key facts

- Buyer: [Balfour Beatty VINCI Systra JV](/buyers/balfour-beatty-vinci-systra-jv/contract-awards)
- Tender value: £10,000,000
- Published: 7 February 2025
- Contract start: 1 July 2027
- Contract end: 9 December 2030
- Stage: open_tender
- Procurement category: works
- Notice ID: 86b23a2a-e291-4791-aba5-3e7ff942bcfd-824263
- OCID: ocds-b5fd17-10501913-9ae5-4ce6-9094-0b80c99c1ae8

## Description

WP12\.4\.1 - Installation of primary steel framework, installation of steel sub frames, cladding tracking systems, firestops, insulation, retail doors and glazing panels for retail units within the station SAB areas\. 1\.1\.1\.1 Scope: For a Subcontractor to fabricate, manufacture, and install fibre cement cladding, internal glazing and smoke downstands, and all internal structural steelwork to support the internal cladding and glazing scope to front of house and station concourse areas\. The scope also to include overclad doors, skirtings trims and architectural finished louvres\. Note the HS2 station internal artwork cladding panels provided by others\. 1\.1\.1\.2 The Contractor will issue a detailed design for pricing as part of the Invitation to Tender\. The Subcontractor will develop the design and coordinate the interfaces of the works, ensuring it is compliant and accepted by the Project Manager prior to commencement of works\. 1\.1\.1\.3 It's anticipated the site works will commence in mid 2027 and are likely to finish end of 2030\. Key materials for the Subcontractor to fabricate, manufacture and install: 1\.1\.1\.4 Bespoke designed steel frame curtain walling system with fixed units, steel frame curtain walling system with single glazed fixed panels - 172m2\. 1\.1\.1\.5 Bespoke fabricated single glazed stick façade system, steel frame curtain walling system with clear faced single glazed units; glazed framed doors and opaque bulkhead infill panels - 577m2\. 1\.1\.1\.6 overall size 2000 x 2500mm high; double leaf doors - 10No\. 1\.1\.1\.7 Fire stops to the ceiling level - Approximately 720m\. 1\.1\.1\.8 Bespoke designed internal steel frame system, with fire rating and acoustic requirements incorporating a combination of clear and back painted fixed single-glazed units - 466m2\. 1\.1\.1\.9 Bespoke fabricated double-glazed system with insulated panels steel frame system with glazed facade system; double glazed fixed panels - 171m2\. 1\.1\.1\.10 Bespoke fabricated double-glazed system, steel frame system with glazed facade system; double glazed fixed panels - 97m2\. 1\.1\.1\.11 Fibre cement cladding lining with stainless steel trims and stainless-steel portal frame, supported by bracketry and rails which shall be fixed back to the vertical posts - 424m2\. 1\.1\.1\.12 Metal Cladding Lining, steel panels to form a rainscreen system shall be supported by bracketry and rails, including supply and install of vertical posts - 1353m2\. 1\.1\.1\.13 Installation of approximately 760m of ceiling firestopping\. 1\.1\.1\.14 Installation of 35No double leaf doors, fixings, door jambs and headers\. 1\.1\.1\.15 Installation of louvers, glazing manifestations, skirting, roller blinds, concertina smoke screen and down stands\. NOTE: LIN-271 is the vitreous enamel art cladding panels, this does not form part of this scope\. Further details can be found on the attached document

## Related contract awards

- [WP15\.03 Old Oak Common Lane \(OOCL\) - Highways \(incl\. Utilities\) &amp; IEP Depot Temp\. / Permanent Road &amp; Retaining Wall \(S4\)](/contracts/ocds-b5fd17-55751d65-1d02-4fbe-b8e3-d9bbdcc3107a) — Balfour Beatty VINCI Systra JV
- [Traffic Management - Old Oak Common \(S4\) Station](/contracts/ocds-b5fd17-f00e8ca2-0c71-48d1-a6ad-c63053a57f72) — Balfour Beatty VINCI Systra JV
- [Fit Out - WP12\.10 Statutory and Wayshowing Signage- Old Oak Common \(S4\) Station](/contracts/ocds-b5fd17-e9564f06-dfe6-4ebd-9832-8219e88b8be6) — Balfour Beatty VINCI Systra JV
- [WP15 Final Highways Scope - Old Oak Common \(S4\) Station](/contracts/ocds-b5fd17-b9e74b50-fd16-4bb2-9e8b-7bc6a60c5dbb) — Balfour Beatty VINCI Systra JV
- [Provide the Fit Out of 1st Floor of Waterdale, Doncaster DN1 3BU](/contracts/ocds-b5fd17-15f392dc-2c8c-4216-8b88-804f4b3853f8) — Rotherham Doncaster and South Humber NHS Foundation Trust
- [Provision of Service Standard Contract: Contract for Insurance Advisory Services](/contracts/ocds-b5fd17-ca5109d5-0cf6-432b-9427-8343f18db8de) — Merseyside Waste Disposal Authority
- [Specialist Support Service For People Bereaved By Suicide](/contracts/ocds-b5fd17-f4987ef7-1add-4fb5-8f5c-69b098c07870) — Kent County Council
- [Digital Consent and Sharing Decision Making Solution](/contracts/ocds-b5fd17-d632ffb5-9d32-48cb-aac1-b8af527a8903) — South Tees Hospitals NHS Foundation Trust
- [Fencing in Public Park and Open Spaces within Taunton](/contracts/ocds-b5fd17-d472a6fd-6974-4ac9-93b3-3128ed385305) — Taunton Town Council
- [Estates Capital Project- LittleBrook Anti-Ligature Doors and Associated Hardware](/contracts/ocds-b5fd17-c39a9521-24fc-435c-ab44-0601ad163c4e) — Kent and Medway Mental Health NHS Trust
- [Consultancy re\. Replacement of Roof and Solar Panels at Cranleigh Health Centre](/contracts/ocds-b5fd17-af1cb71b-f07c-4aaf-b4e0-bd778e6e30a7) — NHS PROPERTY SERVICES LIMITED
- [DNWP0032/LOT1B/ Lot 1B - Management \(Core Team\) FY 26/27](/contracts/ocds-b5fd17-fffa34b1-76f4-49d8-8673-d90e9fe92f69) — Sellafield Ltd

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/86b23a2a-e291-4791-aba5-3e7ff942bcfd-824263)