# EKFB JV - Precast Concrete UTX \(Under Track Crossing\) chambers system and adjoining duct works

> A sourced UK public sector contract award published by Eiffage Kier JV HS2 Main Civils Works, Lots C2 &amp; C3.

## Key facts

- Buyer: [Eiffage Kier JV HS2 Main Civils Works, Lots C2 &amp; C3](/buyers/eiffage-kier-jv-hs2-main-civils-works-lots-c2-c3/contract-awards)
- Tender value: £500,000
- Published: 23 June 2026
- Contract start: 30 September 2026
- Contract end: 1 March 2027
- Stage: open_tender
- Procurement category: works
- Notice ID: 183433b7-20fc-4d4b-827c-d1e515bf47bf-903202
- OCID: ocds-b5fd17-10bcec0d-425d-4f34-8f00-c2486ed03536

## Description

NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture\. We are seeking a specialist subcontractor to undertake the following works within the NC2A section: The Subcontract Works include the provision of all management, labour, materials, plant and equipment, supervision, and other resources necessary and ancillary to safely and correctly complete the installation and handover of Precast Concrete UTX \(Under Track Crossing\) chamber system and adjoining ducts , as described in the specifications, drawings, HS2 standards Requirements and local authority specifications\. The UTX system comprises segmented precast concrete chambers with precast concrete covers, seated on a precast concrete base\. The precast chambers and covers shall be supplied and delivered to site by the Contractor for installation by the Subcontractor\. Contractor will Undertake excavation works to the UTX duct formation level, subcontractor will complete excavation for installation of UTX Chambers and ducts\. The Subcontract works include, but are not limited to: Dewatering of excavations as required\. Provision of edge protection to ensure that excavation is safe for works Protection of all existing assets Setting out the UTX in accordance with the design and specifications, using primary control points provided by the Contractor\. Transfer UTX Chambers from Laydown Area to point of installation Installation of the UTX system comprising segmented precast concrete chambers using methodology provided in detailed design Install all units onto the precast concrete base slabs provided by the Contractor\. Install the full precast assembly, including the Precast concrete chamber segments and Precast concrete covers Install all components in accordance with the approved drawings, specified line and level, and manufacturer's instructions\. Supply and install all associated ducting, ensuring compliance with project specifications and drawings\. As part of installation, CBGM / Cast in situ concrete - minimum FND4 concrete around UTX and ducts to be done by Subcontractor Testing and handover

## Related contract awards

- [EKFB JV - Waste Management Services](/contracts/ocds-b5fd17-5df5feaa-cbec-445f-b7d8-5cfcb68bc82e) — Eiffage Kier JV HS2 Main Civils Works, Lots C2 &amp; C3
- [EKFB - Welfare Equipment \(Additional Mobile Welfare Accommodation Resource\) - Opportunity](/contracts/ocds-b5fd17-449b3aa3-0eea-4418-91a5-75cbda9c5c21) — Eiffage Kier JV HS2 Main Civils Works, Lots C2 &amp; C3
- [EKFB JV - Daywork Hire of 8 Wheel Tipper Wagons - Opportunity](/contracts/ocds-b5fd17-ed575423-46e0-4639-8161-d8e4c0690af8) — Eiffage Kier JV HS2 Main Civils Works, Lots C2 &amp; C3
- [EKFB JV - NC2A Footway and Accommodation Overbridges FRC works](/contracts/ocds-b5fd17-42dc7911-e9b2-421f-a132-84fb552ea77d) — Eiffage Kier JV HS2 Main Civils Works, Lots C2 &amp; C3
- [Provision of General Medical Services at Tollgate Practice](/contracts/ocds-b5fd17-6b020586-1357-4c83-92d9-010ad76c2e5a) — NHS Essex Integrated Care Board
- [CA18389 - Leeds College of Building - Principal Contractor](/contracts/ocds-b5fd17-f21d447a-287f-4a8a-9cfa-904673555d17) — Leeds College of Building
- [Technical Assistance to Embed Renewable Integration in Madagascar Mining Permits](/contracts/ocds-b5fd17-1c6d7c3d-c200-45a2-94b5-6aeb9bef3555) — PALLADIUM INTERNATIONAL LIMITED
- [RA359859 - Security and Fire Maintenance](/contracts/ocds-b5fd17-13d7f711-a8bf-4d42-a0aa-a52f9c8607f3) — NHS Wales Shared Services Partnership \(NWSSP\)
- [EAN - AOMR Lot 3 Water Land and Biodiversity Routine Maintenance 2026-28\_GC](/contracts/ocds-b5fd17-d4802146-b2b7-45f0-84a6-1a6a95f3c687) — Environment Agency
- [PDF Framework - A21 Robertsbridge Layby - SDF](/contracts/ocds-b5fd17-cede0ab5-9dd0-4aa0-a5a9-4bd47e1ac63d) — National Highways Limited
- [PDF Framework - M27 Salisbury Road Deck Repair](/contracts/ocds-b5fd17-9ba08707-2757-40f4-b227-21460b8dab8c) — National Highways Limited
- [Multi-Disciplinary Works Contract for Major Works and Major Repairs](/contracts/ocds-b5fd17-320afec7-78ae-45d6-85b1-88229768734a) — BRUNELCARE

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/183433b7-20fc-4d4b-827c-d1e515bf47bf-903202)
