Awarded
CPU 7635 Phase 2 Church Street Railway Bridge Tie Bar Replacement, Nottingham. Call off from NCC CPU 4625 Highways Structure Framework
£35,849
works
Contract Details
- Tender Value
- £35,849
- Stage
- Awarded
- Published
- Awarded
Timeline
Awarded
Start
Disclosed
End
Description
CPU 7635 Phase 2 Church Street Railway Bridge Tie Bar Replacement, Nottingham. Call off from NCC CPU 4625 Highways Structure Framework
Related Contracts
From This Buyer
- CPU 8566 - Middleton Boulevard Surface Dressing Works
£373,363 ·
- CPU 8564 - BSIP Meadows Way - Delivery of the Carriageway Surfacing Works
£109,461 ·
- CPU 8562 - Gregory Boulevard Cycle Scheme - Provision of Carriageway Surfacing
£83,455 ·
- CPU 8561 - Delivery of Lining Works - Identified through Safety Inspections for 26-27 Financial Year
£46,621 ·
From This Supplier
- YNE Form C Network Rail BAPA Dutch River
£68,834 ·
- Basic Asset Protection Agreement (BAPA) for Trackside Rail Inspections of 24 no. KCC road bridges and footbridges that cross over Network Rail infrastructure planned for 2025/26 programme. NR Reference Number: 184497 - ACE414589
£41,468 ·
- Basic Asset Protection Agreement (BAPA) for Principal Bridge Inspections of 15 no. KCC road bridges and footbridges that cross over Network Rail infrastructure planned for 2025/26 programme. NR Reference Number: 184497 - ACE414590
£98,730 ·
- emergency works Wheatley Park Emergency Slip Network Rail Form C
£27,564 ·
In This Category
- PAHT - ITU Dirty Utility Refurbishment
£52,000 ·
- HD029-25 Peterhouse Road Grimsby
£204,455 ·
- DNWP0019/LOT1B/ WAGR / PIE ILW - Detailed Design
£2,468,738 ·
- PRP318 Glenholme - Refurbishment Works
£1,125,847 ·
Ref: de5f8f1c-4ee5-453e-a12d-1d011402515b-842762 · Sourced from Contracts Finder
View source notice