# Defra Environment Bill Targets, Economic Analysis of Policy Pathways for Increasing Resource Productivity

> A sourced UK public sector contract award published by Defra Network eTendering Portal.

## Key facts

- Buyer: Defra Network eTendering Portal
- Supplier: [Cambridge Econometrics Ltd](/suppliers/cambridge-econometrics/public-sector-contract-awards)
- Award value: £54,455
- Tender value: £54,455
- Award date: 6 September 2021
- Published: 24 September 2021
- Contract start: 13 September 2021
- Contract end: 30 November 2021
- Stage: awarded
- Procurement category: services
- Notice ID: f9c1f8ee-118e-4f8d-9088-aa179df6e7a6-471305
- OCID: ocds-b5fd17-134b8931-2ecf-4375-9ec8-54d8fee54473

## Description

Aim To provide a macroeconomic assessment of policy scenarios for driving improvements in resource productivity in England\. Achieving this overarching aim will require developing or utilising an existing macroeconomic model to deliver scenario analysis based on a shortlist of policies provided by Defra as well as modelling outputs from a Multiregional Input-Output model\. In support of this, the contractor is expected to build on current evidence that will be shared to further develop the data and assumption inputs required for the macroeconomic modelling of those policy scenarios, considering in particular potential implications for costs, spending, trade, prices and labour markets\. This economic analysis will support planned consultation and policy decisions related to potential target-setting in the area of resource efficiency and waste reduction under proposed powers sought in the Environment Bill\. It is not expected that a detailed economic appraisal is feasible for each individual policy, but rather a light-touch analysis across the policy pathways is sought\. Defra are open to proposals and discussion around what would be a proportionate and feasible approach for this analysis within the time constraints of the project\. Background Environment Bill Targets Once in place, the Environment Bill \(EB\) will give the Secretary of State the power to set long-term, legally-binding targets \(&gt;15 years\) across the breadth of the natural environment\. On the 19th of August 2020, Government released a policy paper setting out how initial long-term targets will be developed over the course of the next two years\. Within the area of resource efficiency and waste reduction, initial targets aiming to drive improvements in material resource productivity \(the economic value we generate per unit of raw material use\) and reductions in residual waste \(waste which is usually sent for incineration - including for energy recovery - or landfill\) are being explored\.

## Related contract awards

- [National EA Estates Professional Surveying Framework](/contracts/ocds-b5fd17-9191aaea-5356-4bdc-a3e1-af6b3670e583) — Defra Network eTendering Portal
- [Parliamentary Monitoring Service](/contracts/ocds-b5fd17-a6ea66bd-b313-46f9-a02a-2c5007aa1856) — Defra Network eTendering Portal
- [Provision of Geological Products](/contracts/ocds-b5fd17-8d85b0c1-45ff-4562-9d99-6009685196de) — Defra Network eTendering Portal
- [Risk Management Evaluation &amp; Socioeconomic Impacts of MCCPs being added to the Stockholm Convention](/contracts/ocds-b5fd17-8ea913d9-c93d-414f-a9e2-b74c004e76bf) — Defra Network eTendering Portal
- [C0778 - Research on NWF's Impact on Regional and Local Economic Growth](/contracts/ocds-b5fd17-4526484c-7711-494f-96c1-bc5870438ec8) — NATIONAL WEALTH FUND LIMITED
- [Measuring productivity of Fire and Rescue services in England](/contracts/ocds-b5fd17-9e09278a-0e69-4ffa-a70d-7fb73e49668d) — Home Office
- [Research on the Impact on London's economy of a Hard Brexit](/contracts/ocds-b5fd17-65855337-379b-4e68-9ed0-229f9217140f) — Transport for London
- [Research on competitiveness impacts of carbon policies on UK energy-intensive industrial sectors to 2030](/contracts/ocds-b5fd17-64c17f90-adca-11e6-9901-0019b9f3037b) — The Committee On Climate Change
- [DN782194 EPC Surveys \(Direct Award\)](/contracts/ocds-b5fd17-a9cba2b0-2c95-41d4-8bf6-3b678d7f321c) — London Borough of Hackney
- [Tourism Campaign 2027 - Video Agency tender](/contracts/ocds-b5fd17-a08bea07-7b5c-4c91-afbd-77c605e14093) — North York Moors National Park
- [MRWA Food Waste Prevention campaign 26/27](/contracts/ocds-b5fd17-d0751a7a-92c1-46ca-a009-a08b92e39f84) — Merseyside Waste Disposal Authority
- [5-year maintenance contract for Karl Storz stack systems \(26 items\)](/contracts/ocds-b5fd17-32db329b-fe7b-469d-8277-91e367b98845) — North West Anglia NHS Foundation Trust

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/f9c1f8ee-118e-4f8d-9088-aa179df6e7a6-471305)
