Skip to content

Contract award record

CWF 2A - A323 Threapland Bridge C2001 - Bridge Repairs

Tender value £75,000

Notice details

Published
Category
works
Buyer region
North West

Public buyer and contract winner

Public buyer

Cumberland Council
awarded to

Award value£45,998

  1. Awarded
    Completed
  2. Start
    Completed
  3. End
    Completed

Work description

The Council wishes to procure the following work:\r The Principal Bridge Inspection (PBI) undertaken in 2021 highlighted some high priority defects at Threapland Bridge that need remediation.\r \r It should be noted that where open mortar joints or joints containing friable or cracked mortar are found in the existing main arch, abutments, spandrel walls, wing walls and parapets, the joints shall be raked out down to sound mortar and repointed with mortar designation (ii) as described in the Specification for Highway Works.\r \r The following repairs are required to the brickwork and masonry:\r \r 1. The spandrel walls require repointing throughout.\r 2. Areas of spalled or missing brickwork on the spandrel walls require repair or replacement.\r 3. The abutment walls require repointing throughout.\r 4. The outer face of the abutment walls require repointing and possible stitching to remediate the existing cracking and separation.\r 5. Areas of spalled, missing or loose brickwork on the abutment walls require repair or replacement.\r 6. The gap between the rear abutment and adjacent bedrock on the upstream north and south face and the downstream north and south face should be pointed and sealed.\r 7. The arch barrel requires repointing throughout.\r 8. The arch rings at each elevation require repointing and possible stitching to remediate the existing separation.\r 9. Missing brickwork on the arch ring should be replaced.\r 10. The upstream and downstream brickwork headwalls require repointing.\r 11. Missing brickwork from the headwalls require repair or replacement.\r 12. The outer face of the upstream and downstream stone parapets require repointing.\r 13. Missing stone from the outer face of the downstream parapet require repair or replacement.\r 14. Vegetation (ivy, saplings etc) from the parapet outer faces should be removed.\r 15. Mature trees (4No.) at each of the approaches should be removed and Eco Plugged.\r 16. After the trees have been removed and where required the parapets should be extended to offer edge protection on approaching the bridge.

Related awards

Source: Contracts Finder · Notice 7e4f9580-dac2-4d5a-9f60-e45c25303d72-696659

View source notice