The Pirbright Institute Brooksby Building - SIL 1 HVAC Shutdown System from Overpressure and Underpressure Hazard Scenarios
Contract Details
- Tender Value
- £100,000
- Stage
- Open Tender
- Published
Timeline
Description
Following a Layers of Protection Analysis (LOPA), The Pirbright Institute requires the design and construction of a safety system that detects overpressure and underpressure of various areas and rooms in the Brooksby facility. The system subsequently responds by shutting down the ventilation system by turning off supply and extract fans. As per Functional Safety standards IEC 61508 and IEC 61511, Pirbright requires this system to be reliable to Safety Integrity Level (SIL) 1. Safety Requirement System (SRS) attached at the back of this document for more detail. Pirbright expects that the designer will have good awareness of the above-mentioned functional safety standards, and to be able to carry out their activities in adherence to the functional safety lifecycle phases as per IEC 61511. A non-exhaustive list of typical deliverables for such a project is as follows: • Data sheets for all sensing elements (e.g., level switch), logic solvers and all final elements (e.g., valves) • Bill of Materials (BoM) for all materials and accessories to be purchased • Quotations for all required materials • Functional logic diagrams (if required) • I/O lists • Functional Design Specifications (FDS) • Loop diagrams • Instrument wiring diagrams • Electrical wiring diagrams • Control panel layout and drawings • Safety Integrity Level (SIL) Verification report • SIL certifications for all relevant hardware (if available) • Factory Acceptance Test (FAT) procedures • Site Acceptance Test (SAT) procedures • Safety Instrumented System (SIS) installation and commissioning plan • SIS validation plan • Safety manuals • Proof test procedure • Spare parts list • Assets' register ready for upload to Pirbright Computerised Maintenance Management System (CMMS).
Related Contracts
From This Buyer
- ISO 11 Incinerator Life Extension Project - WP 5 Refractory Replacement
£454,525 ·
- ISO 11 Incinerator Life Extension Project - WP6 Diesel Tank Replacement
£51,081 ·
- Supply and Install of Uninterrupted Power Supply to BACS Control Panels
£45,180 ·
- Project Management re. Brooksby Building BACS additional works
£79,800 ·
From This Supplier
In This Category
- Fencing in Public Park and Open Spaces within Taunton
£57,000 ·
- Estates Capital Project- LittleBrook Anti-Ligature Doors and Associated Hardware
£35,371 ·
- Consultancy re. Replacement of Roof and Solar Panels at Cranleigh Health Centre
£98,415 ·
- DNWP0032/LOT1B/ Lot 1B - Management (Core Team) FY 26/27
£3,150,939 ·
Ref: 2525728e-4119-414e-b923-c7594bdcc422-664840 · Sourced from Contracts Finder
View source notice