Skip to content

Tender notice

Air temp & relative humidity sensors

Notice details

Published
Category
goods
Buyer region
North West

Public buyer

Tender value£8,000

  1. Planned start
    As published in the notice
  2. Planned end
    As published in the notice

Work description

Energy House 2 (EH2) is a large-scale building physics test laboratory to be built at the University of Salford, Manchester. The project Is part funded by the ERDF. The construction will begin in summer 2020 with the construction period set to last 12 months. The project builds on the successful Energy House project :(https://www.salford.ac.uk/built-environment/laboratories-and-studios/energyhouse ). A video of the project can be found here https://www.youtube.com/watch?v=oP3bsXeQKYU EH2 will be a unique facility and one of most advanced building test facilities on the planet. It has the following features: • 2 large chambers capable of having 2 family homes built in each one (4 homes in total) • Temperature controlled to within 0.5 °C from -20°C to +40 °C • Wind, rain, solar radiation and snow can be generated • These conditions provide testing facilities for housing covering 95% of the global population. The Energy House 2 Project has a requirement to measure RH&T in a chamber environment. These sensors will form part of a sensor network over 300 sensors. These will report back into a database using the SDI12 standard. Please go to our InTend portal for full tender documentation: https://in-tendhost.co.uk/salford/aspx/Home

Additional information: Please send all correspondence to our InTend portal: https://in-tendhost.co.uk/salford/aspx/Home

Related awards

From this public buyer

View all awards from this public buyer

Source: Contracts Finder · Notice dfa8bc50-cec7-484f-89ca-734e20347b0d-450707

View source notice