Skip to content

Contract award record

ESS Storage Pit Lids

Notice details

Published
Category
goods
Buyer region
South East

Public buyer and contract winner

awarded to

Contract winner

Abbey Engineering LLP T/A The Abbey Group

Award value£1

  1. Awarded
    Completed
  2. Start
    Completed
  3. End
    Completed

Work description

This UK Atomic Energy Authority has a requirement for the manufacturing, assembly, testing, inspection and transport for shielding lids and their corresponding location frames under a 'build to print' contract, to be used in the European Spallation Source (ESS) in Lund, Sweden.

Each Pit Lid is constructed from high density reinforced concrete, encased in an 8mm welded stainless steel shell. The Pit Lids each have some variation in shape and size, with weights in the region of 15-25t. The exterior plates form a labyrinth design, that attenuates radiation. There are also 5 location frames to be constructed, from stainless steel angle bar, which also include location features. These frames are to be installed within the pit surround to form a base upon which a set of Pit Lids are placed.

The contract dates detailed within this notice are estimated and may be subject to change.

Related awards

Source: Contracts Finder · Notice d59a5873-4670-4865-94bc-a0ed948be346-431569

View source notice