Relocation of the Indoor Market via Pagabo Framework - Refit and Refurbishment framework, to Lot 3, covering values between £1m - £5m,
£96,105
Contract Details
- Tender Value
- £96,105
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
Pre-Construction Services Agreement to provide a clear programme until the end of RIBA 4, undertake electric supply logging on the existing mains electric supply, Undertake point cloud survey of the ground floor areas, Undertake design of the, mechanical, electrical and public services design until RIBA 6, and architectural design from RIBA 4 to RIBA 6, Provide value engineering opportunities, Procure sub-contracting work via the provision of three quotations per sub-contractor, prepare detailed construction programme, Provide the full names of the Architect, Structural, Mechanical, Electrical and Public Services Engineer, PD for CDM and Fire Consultant, Obtain CCTV survey for the drainage system, Identify provisional sums, Break Down all Preliminaries.
Related Contracts
From This Buyer
- EPC and Condition Surveys via ProcurePublic - Building and Stock Condition Surveyors Framework
£162,040 ·
- Leisure Centre Main Construction via SCAPE Construction Framework
£39,383,513 ·
- SBC 0126 The Provision of Occupational Health Services for Stevenage BC and East Herts DC through ESPO Framework 985B_23 Lot 1
£102,295 ·
- HVO Vehicle Fuels 2026 - via CCS Framework RM6305 liquid fuels.
£534,000 ·
From This Supplier
In This Category
- PAHT - ITU Dirty Utility Refurbishment
£52,000 ·
- HD029-25 Peterhouse Road Grimsby
£204,455 ·
- DNWP0019/LOT1B/ WAGR / PIE ILW - Detailed Design
£2,468,738 ·
- PRP318 Glenholme - Refurbishment Works
£1,125,847 ·
Ref: 3533308a-9ab9-4315-8bc8-0e2792560ebd-851626 · Sourced from Contracts Finder
View source notice