Skip to content

Tender notice

University of Sunderland - National Glass Centre - Boiler Replacement

Notice details

Published
Category
works
Buyer region
North East

Public buyer

Tender valueNot disclosed

  1. Planned start
    As published in the notice
  2. Planned end
    As published in the notice

Work description

Specification for Authority

The works consist of replacing the existing boiler, flue, pumps, controls and associated equipment. To enable new boiler plant to be installed, existing equipment shall be stripped out as shown and described in this document and on the drawings. The existing boiler plant must remain in operation throughout the works until the final switch over. The main contractor shall be the mechanical contractor and should allow for all works necessary to complete the project, including builders work, electrical works, any structural input required, approvals, issuing of all necessary documentation and notifications. In addition to the new boiler plant, electric water heaters shall be installed, and the existing centralised hot water system stripped out/back. All works are described on the drawings and within the specifications.

Additional information: Expression of interest and tender documents via the University of Sunderland E-Portal. https://in-tendhost.co.uk/universityofsunderland/aspx/Home

Is a Recurrent Procurement Type? : No

Related awards

Source: Contracts Finder · Notice 7b8ac1f4-99d7-47fb-a8e3-53a97c08c74f-364200

View source notice