Awarded
Rye Harbour East Pier Head Marker Refurbishment Works (D&B)
£17,517
Defra Network eTendering PortalAmalgamated Construction Ltd
works
Contract Details
- Tender Value
- £155,759
- Stage
- Awarded
- Published
- Awarded
Timeline
Awarded
Start
End
Disclosed
Description
Refurbishment of East Pier Head Marker at Rye Harbour Name and edition of the form of contract: NEC4 ECSC Details of where further information about the Terms and Conditions can be obtained, together with the relevant contact point: info@neccontract.com Additional information: Name and edition of the form of contract: NEC4 ECSC Details of where further information about the Terms and Conditions can be obtained, together with the relevant contact point: info@neccontract.com
Related Contracts
From This Buyer
From This Supplier
- MetroWest Phase 1B Highways and Bridges Design and Construction Contract - Award of Stage 2 Package 2 Bridges Contract 3 (Royal Portbury Dock Road)
£1,170,226 ·
- MetroWest Phase 1B Highways and Bridges Design and Construction Contract - Award of Stage 2 Package 2 Bridges Contract 2 (Sheepway and Old Station Road Bridges)
£1,475,605 ·
- MetroWest Phase 1B Highways and Bridges Design and Construction Contract - Award of Stage 2 Package 2 Bridges Contract 1 (Marsh Lane Bridge)
£311,574 ·
- MetroWest Phase 1B Highways and Bridges Design and Construction Contract - Award of Stage 2 Package 1 Highways Contract
£1,936,200 ·
In This Category
Ref: 5a4b3699-8298-4774-a327-c7b02a339080-472324 · Sourced from Contracts Finder
View source notice