Contract award record
Re-roofing and associated works at the Sutton Bonington Campus - AWARD
Notice details
- Published
- Category
- works
- Buyer region
- East Midlands
- Source
- View official notice
Public buyer and contract winner
Award value£679,000
- AwardedCompleted
- StartCompleted
- EndCompleted
Work description
The UoN is not a contracting authority for the purposes of the Public Contracts Regulations 2015 (as amended) and its procurement activities are not subject to the Public Contracts Regulations 2015.
Synopsis: Primary contractor required to carry out Roof Renewal Works at the South Labs and The Boiler House Buildings including:
o Remove all existing waterproofing, insulation, and any Air & Vapour Control Layers from all perimeter upstands and detailing to abutment upstands and vertical skirtings. o Blisters / Detached bitumen membrane: Repair, re-adhere and protect with additional layer of matching bitumen membrane if necessary. o All new materials and accessories: Must be compatible with existing. Some brands & materials to be specified o Renewing roof as specified including: Preliminary work including formation of abutment upstands, kerbs, box gutters, sumps, grooves, chases and expansion joints. o Fixing of battens, fillets and anchoring plugs/strips as required. o Thorough Priming o Applying new underlayer, capping sheets, upstands and detailing in line with the specification.