GB-Telford: Hollies Road Project 2018
£685,135
Contract Details
- Tender Value
- £685,135
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
Telford and Wrekin Council Resurfacing 2018, Orleton lane and Hollies Road: Orleton Lane and Hollies Road run north to south to the West of Wellington. The project also includes two side roads named Steventon Road and Cranage Crescent which form a loop off Hollies Road. The roads are on average 5.5m wide with a total length of 1122m. The post code is TF1 2AA with the grid reference being (364485,311266) and (364444, 311913). The works comprise: •Carriageway resurfacing and associated road markings •Resurfacing of footways along with kerb replacement at parts. •Drainage improvements •Sign replacements (including elements of contractor design) In addition, the project will include resurfacing of a 260m long section of Spring Hill located north of Orleton Lane towards Morrison's roundabout with an average road width of 6.5m. Post code TF1 3HE with a grid reference of (364479, 311919). The works on this section will include: •Carriageway resurfacing and associated road markings •Drainage improvements
Related Contracts
From This Buyer
From This Supplier
In This Category
- CBC-2087-Q-SM Wet Floor Shower Delivery - AWARD
£0 ·
- Core Hole Drilling
£132,000 ·
- Cyclical Decoration Works Contract
£560,000 ·
- Surface Works throughout Taunton
£70,000 ·
Ref: ca6b1090-1e04-43d7-a384-c422cc874f8f-233419 · Sourced from Contracts Finder
View source notice