Skip to content

Tender notice

SMARTLINE Project - Sensor Installation, Maintenance and Removal

Notice details

Published
Category
services
Buyer region
South West

Public buyer

Tender valueNot disclosed

  1. Planned start
    As published in the notice
  2. Planned end
    As published in the notice

Work description

Scope of Work 14. This tender consists of 14.1. Becoming familiar with the installation requirements of the sensors / gateways 14.2. Arranging installation appointments following the standard Coastline Housing process described in sections above 14.3. Receiving, physically checking and managing stocks of pre-configured / labelled sensors 14.4. Installing sensors, gateways and other devices in homes 14.5. Ensuring the specified connectivity back to the Data Collection System is in place 14.6. Confirming that the sensors are communicating with the Data Collection System and data is being collected, using the system provided. 14.7. Re-visit houses during the maintenance period to maintain / replace equipment (including making the appointments with residents) in line with the Maintenance SLA requirements set out below. 14.8. De-install all equipment by the end of the project period. This may be on an 'as required' basis if home decided to withdraw from the project and/or at the end of the 2 year data collection period (see Project Timescale section) 14.9. Maintain and communicate accurate records of all contacts with residents 14.10. Maintain and communicate accurate records of all sensors, gateways and other equipment installed, maintained and de-installed. 14.11. Collate equipment de-installed and handover to the project team at the end of the project 14.12. Report on a monthly basis 14.13. Produce an end-of-project report

Related awards

From this public buyer

View all awards from this public buyer

Source: Contracts Finder · Notice 575bed5b-a349-4d0e-9638-bb3ed0d32bb4-158730

View source notice