# Water Resource Management Plan \(WRMP\), Regional Plan and RAPID gate two assessment support to Ofwat

> A sourced UK public sector contract award published by O F W A T.

## Key facts

- Buyer: [O F W A T](/buyers/o-f-w-a-t/contract-awards)
- Supplier: [HR WALLINGFORD LIMITED](/suppliers/hr-wallingford/public-sector-contract-awards)
- Award value: £0
- Award date: 6 September 2022
- Published: 22 March 2023
- Contract start: 7 September 2022
- Contract end: 7 June 2023
- Stage: awarded
- Procurement category: services
- Notice ID: 68afa040-aad1-49b3-a64c-31aaac202571-626716
- OCID: ocds-b5fd17-32fd65d5-6cc0-4d9e-b0cc-4a797871374a

## Description

We require at least four water resource specialists / engineers / asset managers to support the assessment of draft Water Resource Management Plans \(WRMPs\), regional plans and RAPID solutions for the period from 7 September 2022 to 7 June 2023\. During September there will be a period of training and familiarisation\. We require full time and/or part time at least 3 days a week average commitment from each staff member, although this may vary particularly during the familiarisation period in September\. In general, this work will consist of a desk-based assessment of each of the received plans and submissions and appended documentation\. It will support the development of RAPID's recommendations on gate two submissions and Ofwat's response to draft WRMP and regional plan consultations\. We welcome consortium bids\. Each of the Key Personnel will be working as part of structured assessment team and will report to a member of the RAPID and Ofwat teams\. They will have access to the draft WRMP / regional plans and RAPID submissions supported by a number of appendices\. The assessment will be carried out using a proportionate and risk-based approach using a framework that incorporates assessment criteria supported by a number of tests\. We will provide training on the assessment framework, criteria and outcomes prior to the work commencing\. The roles we are seeking to resource are described below\. Engineering and technical test area support for WRMPs, regional plans and RAPID solution gate two assessments at Senior Consultant level\. Assessment of the water resources engineering and technical aspects of the WRMPs, regional plans and gate two submissions received\. The Key Personnel will be working alongside and reporting to RAPID and Ofwat staff\. This assessment will support that of the existing Ofwat and RAPID engineering and water resources teams\. The Key Personnel will be expected to join short on-line Ofwat team check-in and progress meetings several times a week\. Responsibilities will include: • Assessment of the technical water resources aspects and CAPEX and OPEX costs of each of the WRMPs and options within, regional plans and gated submissions received\. • Analysis of WRMP and regional plan table submissions\. • Quality written outputs for inclusion in all consultation response documents and presentations\. • Compliance with timetables/quality expectations\.

## Related contract awards

- [Review of Ofwat's New Appointments and Variations \(NAV\) Financial Viability Assessment](/contracts/ocds-b5fd17-a7951435-eb45-46b6-a0bb-9df491eab5ae) — O F W A T
- [Technical support for Ford and Aylesford Water Recycling Project](/contracts/ocds-b5fd17-d1bc6943-4d11-436c-aab3-35f399c2419b) — O F W A T
- [Technical support for DPC project Hampshire Water Transfer and Water Recycling project](/contracts/ocds-b5fd17-80a7b510-0020-4505-b0a2-bd7475fc138f) — O F W A T
- [Interim Senior Associate \(Policy\), for Major Projects \(6-months\)](/contracts/ocds-b5fd17-6d4037c1-3fdd-4268-ab72-003349efae82) — O F W A T
- [Technical Advice on the development and delivery of reservoir projects under the licensed infrastructure provider model \(SIPR\)](/contracts/ocds-b5fd17-332ad7e9-c830-43a7-8ed4-0fbfd2a47cad) — O F W A T
- [Reservoir Consultancy](/contracts/ocds-b5fd17-d952dcf1-eb28-491f-a008-b5a9befafa62) — Water Services Regulation Authority
- [Gate 1 Assessment Support](/contracts/ocds-b5fd17-8cee4a6a-1d2d-4d06-9a20-7dc7477bd6f9) — Water Services Regulation Authority
- [Scoping review of projections and futures relevant to management of water and water ecosystems in England - Awarded](/contracts/ocds-b5fd17-0bb57449-abab-48b3-af3a-4497f8ce11f9) — DEPARTMENT FOR ENVIRONMENT FOOD &amp; RURAL AFFAIRS
- [Taxi and MPV \(1-8 seats\) Passenger Assistant - Taxi and MPV \(1-8 seats\) Passenger Assistant](/contracts/ocds-b5fd17-6fc09fa4-8e19-4d58-afc2-13a1d749b26f) — East Sussex County Council
- [GovAssure Independent Audit for One Login](/contracts/ocds-b5fd17-37d14fb8-c934-474d-93ce-864fcab3f58e) — DSIT
- [Thurnham Radar- Radome maintenance](/contracts/ocds-b5fd17-b55277e8-5cea-471a-9760-4f125017b824) — Met Office
- [Fire safety risk management system \(Farynor\)](/contracts/ocds-b5fd17-acb0bee8-3b04-4c95-aaf6-4167fec87e0d) — West Sussex County Council

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/68afa040-aad1-49b3-a64c-31aaac202571-626716)