# Safe and Warm Upgrade Scheme at Hides Green and Hill Top Bolsover - AWARD

> A sourced UK public sector contract award published by Bolsover District Council.

## Key facts

- Buyer: [Bolsover District Council](/buyers/bolsover-district-council/contract-awards)
- Supplier: [Matthews and Tannert Ltd](/suppliers/matthews-and-tannert/public-sector-contract-awards)
- Award value: £426,638
- Award date: 20 November 2018
- Published: 21 June 2019
- Contract start: 19 November 2018
- Contract end: 29 April 2019
- Stage: awarded
- Procurement category: works
- Notice ID: 49e813e3-60fb-4bcf-9dea-efc085d3e50f-296633
- OCID: ocds-b5fd17-370139c7-3fea-4e8c-b0b2-5055f7dbb2a6

## Description

Bolsover District Council wishes to appoint a principal contractor on the basis of a minor works JCT contract for the undertaking of Safe &amp; Warm upgrade works at the 8No blocks of flats and 6No bungalows located at Hides Green and Hill Top in Bolsover\. Each block contains two ground floor and two first floor flats, the latter having their own private stairwell access\. There are 32no flats in total across the site\. The main scope of this scheme is to provide central heating upgrading, kitchen upgrades, wet room conversion and improved fire safety measures within each of the flats\. Currently, heating and hot water is supplied to each flat on a communal system provided from a central boiler house, located on the site\. Due to the age and general condition of the boiler it is proposed for each flat to have its own independently controlled heating system installed in the form of a gas combi-boiler\. The appointed contractor will be charged with the isolation and capping-off of the existing heating system at each flat within the programme of works\. Please note that the de-commissioning of the boiler house will not form part of this project and is to be undertaken by the authority's facilities management contractor\. Existing Kitchens will be upgraded, replacing units and worktops and improving electrical provision only\. Existing shower areas are to be altered and a full wetroom conversion is to be undertaken to a standard design across all flats\. This will involve the installation of a new shower, wash hand basin and w/c complete to improve and standardise the facility for all flats\. To improve the fire safety aspects of the dwelling the installation of a new multi-sensor alarm system is to be installed and fire-stopping implemented throughout as per the requested fire compartmentation survey which the appointed contractor is to arrange and oversee as part of the project\. It is estimated that a start on site is achievable for early December 2018 and that completion of the scheme should be achieved within a 20 week programme\. The tenant needs and requirements are paramount to the successful completion of this project\. The successful contractor will be expected to show flexibility, excellence in tenant support / liaison and work in partnership with the Contract Administrator / Building Surveyor to meet and exceed tenant expectation and levels of satisfaction\.

## Related contract awards

- [Invitation to Tender for the Safe and Warm II Upgrade Scheme at Victoria House, Creswell - AWARD](/contracts/ocds-b5fd17-dd007a23-4205-4264-b9e1-d29946ba5143) — Bolsover District Council
- [Health and Safety Training - AWARD](/contracts/ocds-b5fd17-eea1f628-b912-4993-97cf-ee34da5fe49e) — Bolsover District Council
- [Tthe provision of a Property Security Contract - AWARD](/contracts/ocds-b5fd17-e4ca29c5-1334-47b6-b085-0a29052d6476) — Bolsover District Council
- [Positive Input Ventilation System - AWARD](/contracts/ocds-b5fd17-e01807e1-5f6d-463c-b8b5-d142eab10b66) — Bolsover District Council
- [Boiler Installation \(Planned Replacements And Ad-Hoc\) \(via Minor Construction Works and Maintenance Purchasing System DPS - Lot 4 - Heating and Hot Water Systems &amp; Associated Plant \(install &amp;/or maintenance\)](/contracts/ocds-b5fd17-e8300128-71a9-4380-9265-5e3eb37d0bd2) — Nottinghamshire County Council
- [Lot 4 - Design, Supply and Installation of Replacement Heating and Domestic Hot Water Provision to Individual Flats and Communal Areas at Aspley Court, Sutton-in-Ashfield](/contracts/ocds-b5fd17-4750463e-e57a-40d6-a994-35b9d1ae4c6e) — Nottinghamshire County Council
- [Lot 26 - Aids and Adaptions To various Council owned Properties throughout the District of Ashfield](/contracts/ocds-b5fd17-b6c6e88f-a882-4e2e-aaa3-9d2ebf040a37) — Nottinghamshire County Council
- [NUN - Repairs Programme](/contracts/ocds-b5fd17-28b36ef2-78d1-4b0a-b6c2-88e294fa5247) — Nuneaton &amp; Bedworth Borough Council
- [Installation Services, Small Works and Reactive Call Outs](/contracts/ocds-b5fd17-9a3a801b-3d9b-45bd-a1c0-330f57949444) — Gloucestershire Health and Care NHS Foundation Trust
- [M62 Red Lane Dike Bridge Refurbishment - Ground Investigation](/contracts/ocds-b5fd17-199f371a-d0db-473e-a734-b33746969b76) — National Highways Limited
- [Ebury Phase 2 Marking Suite Fitout Contractor](/contracts/ocds-b5fd17-34a84eb0-f527-44ce-bd81-cc5dc466edb4) — Westminster City Council
- [CA18338 - Chesterfield College Training &amp; Production kitchen ducting, heating and control panel](/contracts/ocds-b5fd17-a18f2594-e9d1-44d8-bb84-af476f45d642) — Chesterfield College

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/49e813e3-60fb-4bcf-9dea-efc085d3e50f-296633)
