# PR3930-WH-Boiler Replacement at Goodinge Health Centre\.

> A sourced UK public sector contract award published by Partners Procurement Service.

## Key facts

- Buyer: [Partners Procurement Service](/buyers/partners-procurement-service/contract-awards)
- Supplier: [BSW Heating](/suppliers/bsw-heating/public-sector-contract-awards)
- Award value: £41,394
- Tender value: £41,394
- Award date: 31 August 2017
- Published: 12 December 2017
- Contract start: 1 September 2017
- Contract end: 31 December 2017
- Stage: awarded
- Procurement category: works
- Notice ID: 2d3fb1df-a9f6-47d9-a81b-881f0a0ad62d-186709
- OCID: ocds-b5fd17-3d9303ce-707e-45ca-95ab-65690d1e38b9

## Description

The contractor shall allow to install the new boiler, associated equipment and controls prior to the replacement of the existing boilers expansion vessel and safety valve\. This is to ensure that the heating and hot water to the day care centre and health clinic are not affected by the works in any way with the exception of the flue works which must be undertaken in close liaison with the building operators\. The contractor shall allow for all necessary temporary power etc\. to enable the above clause to be realised\. A new control points will be installed concurrently\. All plant items tested and commissioned by the manufacturers etc\. The Tender will be computed in strict accordance with the Specification, however, where the Contractor wishes to put forward alternative equipment or method to that specified, notice in writing must be given at the time the Tender is submitted stating: • The alternative equipment or method proposed, and • The cost implications of the alternative submitted Should the alternatives although agreed by the Engineers prove of lower quality when installed than that specified, the Contractor shall revert to the original material or intent at their own cost\.

## Related contract awards

- [RFL - MAINT7246 - Fujifilm endoscopy equipment 3 year maintenance contract - Cover as per quote - Silver and Gold - NHSSC Framework ref - 2021/S000-021535](/contracts/ocds-b5fd17-1b5c1196-39b4-4642-bfb5-9ee8e87f1e68) — Partners Procurement Service
- [RFL - MAINT4441 - ARTIS ZEE MP 10 YEAR P\.O\.S\. WARRANTY BUY OUT MAINT CONTRACT](/contracts/ocds-b5fd17-5e8377a0-ac44-46e1-b85c-e3f94de096f5) — Partners Procurement Service
- [Great Ormond Street MAINT7216- 6 operating tables\. From \(01/GOSH - MAINT7216 Maintenance for 6 operating tables Framework Reference: 2021/S000-021535](/contracts/ocds-b5fd17-c696dd29-4388-495f-8a90-da49a2672514) — Partners Procurement Service
- [6873-27 - NBCL CONNECT Immunoassay Analyzer](/contracts/ocds-b5fd17-00d6d80a-a5b0-4bb1-8130-d1820cd4ae80) — Partners Procurement Service
- [P5514 BARNSLEY STREET DHS DIVERSIONS](/contracts/ocds-b5fd17-f76d2598-c108-4cdc-bb10-b70a2eccea76) — Tower Hamlets
- [Replacement of Communal Heating Plant](/contracts/ocds-b5fd17-b3a98b5a-2a0a-4f24-bfb3-d7d7baedaf41) — Canterbury City Council
- [EC1271 Tudor Primary School](/contracts/ocds-b5fd17-b09b88fc-628b-49cf-b060-fd8a3221376f) — London Borough of Ealing
- [Fairview Primary School Replacement Heating System](/contracts/ocds-b5fd17-f2e7bb41-eedb-425a-a02c-f0e3c9a5150a) — Medway Council
- [E20017 - Nags Heag Hill - Air Balloon Road Drainage Correction Work](/contracts/ocds-b5fd17-7d8cc0ec-773a-4e69-a697-4d8957e2d4b4) — Bristol City Council
- [Hillingdon PS HQ - M&amp;E Works](/contracts/ocds-b5fd17-16130349-afd8-4a0a-bc2c-dcd28ebd81ac) — METROPOLITAN POLICE SERVICE
- [UKRI-5114 MRC Harwell Lab Refurbishment](/contracts/ocds-b5fd17-98ae30d4-ada7-46c7-8132-5ccbe7b7a24b) — UK Research and Innovation
- [Replacement Bio-Mass Boiler &amp; Associated Works](/contracts/ocds-b5fd17-309b98f4-e354-4ef6-921e-4fcf61ba6bb1) — ALIGN PROPERTY SERVICES LIMITED

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/2d3fb1df-a9f6-47d9-a81b-881f0a0ad62d-186709)
