ContractPulse
Awarded

Q20533 - Jackson's Boat Footbridge Refurbishment Scheme Phase 3

£293,111

works

Contract Details

Tender Value
£293,111
Stage
Awarded
Published
Awarded

Timeline

Awarded
Start
Disclosed
End

Description

Via Bolton Council's Framework: TC005 Framework for Highways Work Lot 4 - Bridges and Highway Structures Improvement and Maintenance Works up to £2.0m The proposed works will clean and repaint the entire Jackson's Boat Footbridge's metalwork to renew the corrosions protection. The existing timber deck boards have only recently been replaced; the footbridge timberwork to be taken down and reinstated after the footbridge repainting works. The footbridge spans over a main river and the footbridge repaint work will require full encapsulation to prevent paint and construction debris entering the watercourse beneath. The works are to include for working longer days and Saturdays as per S 270.

Related Contracts

Ref: 2fd74b97-3ea9-43bd-86f3-e4b3dcd723fb-788698 · Sourced from Contracts Finder

View source notice