Newham Trail Truro Bridge Repairs
£74,230
Contract Details
- Tender Value
- £111,000
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
orserv on behalf of Cormac Solutions Ltd wish to appoint a suitably experienced and qualified contractor to undertake bridge repair works at Newham Trails Truro, under an NEC Option A ECS (Engineering & Construction Subcontract). *Full Scope of Works: • The Bridge Repairs package for the Newham Trails including supply of all materials, labour and plant necessary to provide the items shown on the Subcontract Works Information as summarised below : Arch Hill Bridge and Penweathers Rail East Bridge All as shown on Drawings CN2000551-CSL-SBR-SW819433-DE-C-0001-A2 Rev C02 and DE-C-0002-A2 Rev 02 A Repairs to timber deck, transverse beams Cross Transverse and New Longitudinal timbers B Remove damaged bottom flange and replace with new mild steel grade S275 JR or wrought iron plate of 12mm thickness. C A mild steel spacer plate grade S275 JR is to be installed securely to support longitudinal timber bearing strip D Mild steel spacer and new plate if made from mild steel to be primed and external faces painted black with suitable colour E Installation of Temporary Access Ramp and Bridge Protection F Temporary Works scaffolding NOTE - this package does not include - Groundworks - Streetlighting - Rock anchoring, rockfall netting and fencing - Fencing/gates - Vegetation and scrub clearance, tree felling or pruning, planting or herbicide treatment areas. IMPORTANT NOTEs - Tenderers are required to submit an Option A Activity Schedule price with the activities reasonably broken down to resemble the programme. Tenderers are required to submit a programme Tenderers are required to complete Subcontract Data part 2 and return with their submission. Specific Works Location & Restrictions Access will be controlled by Cormac Solutions Ltd site management team Relevant contacts and telephone numbers for site visits and technical queries: • - Andy Berryman - Project Manager - 07875 648 966 - Andrew.Berryman@cormacltd.co.uk • - David Vaughan - Project Surveyor - 07871 983 498 - david.vaughan@cormacltd.co.uk The intention is to award the contract to the most economically advantageous tender based on 80% Price and 20% Quality To access the online question template and supporting documents, express an interest and then click the "start my response" button
Related Contracts
From This Buyer
From This Supplier
- MetroWest Phase 1B Highways and Bridges Design and Construction Contract - Award of Stage 2 Package 2 Bridges Contract 3 (Royal Portbury Dock Road)
£1,170,226 ·
- MetroWest Phase 1B Highways and Bridges Design and Construction Contract - Award of Stage 2 Package 2 Bridges Contract 2 (Sheepway and Old Station Road Bridges)
£1,475,605 ·
- MetroWest Phase 1B Highways and Bridges Design and Construction Contract - Award of Stage 2 Package 2 Bridges Contract 1 (Marsh Lane Bridge)
£311,574 ·
- MetroWest Phase 1B Highways and Bridges Design and Construction Contract - Award of Stage 2 Package 1 Highways Contract
£1,936,200 ·
In This Category
Ref: aa2fcb08-1c52-435c-9f5b-b65f866c5a69-536463 · Sourced from Contracts Finder
View source notice