Awarded
UKRI-1054 - Optical Fibre Installation
£268,690
goods
Contract Details
- Tender Value
- £268,690
- Stage
- Awarded
- Published
- Awarded
Timeline
Awarded
Start
Disclosed
End
Description
This work is to install new optical fibres at Boulby mine to serve the current STFC underground lab facility and to prepare for a future facility AIT-NEO. The work involves designing brackets to support the optical fibres in the main number 2 shaft at Boulby mine, then installing these brackets and then the optical fibres - all working alongside existing mining operations and adhering to local health and safety systems.
Related Contracts
From This Buyer
From This Supplier
- BE24293 - Laboratory Floor Works
£13,180 ·
- GB-Swindon: UKRI-4253 Site survey and design of 2x physically diverse fibre duct routes
£52,049 ·
- GB-Swindon: UKRI-4154 Ongoing Assistance Works
£25,000 ·
- UKRI-3945 Structural Steelwork for the construction of the new underground laboratory at Boulby Mine
£333,340 ·