CWF 2a C2016 Stage 2 Construction - Camerton sheet piling with capping beam, rock revetment and carriageway renewal design and build works
£271,519
Contract Details
- Tender Value
- £271,519
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
Stage 2 Construction Contract - The scheme comprises remedial works for a section of highway, on the C2016 between Camerton and Great Broughton. The site is located approximately 1km east of Camerton, Cumbria, at National Grid Reference - NY 04431 30768. The site comprises an area of failed highway embankment carrying the C2016 adjacent to the River Derwent. The slope failure comprises a translational slip around 40m long, 1.5m wide (max) and 2m high, where material supporting the C2016 has moved downslope into the channel of the River Derwent and subsequently washed downstream. The anticipated remediation works comprise the design and build construction of a sheet pile retaining wall with concrete capping beam, the embankment reconstructed with engineered fill with carriageway reinstated to the correct standards and the installation of rock armour revetment to provide additional erosion resistance.
Related Contracts
From This Buyer
From This Supplier
- Q20516 - Ashton Canal Bridge
£1,664,625 ·
- Bridge Maintenance Framework
£2,600,000 ·
- Dynamic Purchasing System for the Provision of Various Engineering Works
£5,000,000 ·
- CWF Lot 2A - Barrow Dock Museum, Amphitheatre Events space
£198,632 ·
In This Category
- CBC-2087-Q-SM Wet Floor Shower Delivery - AWARD
£0 ·
- Core Hole Drilling
£132,000 ·
- Cyclical Decoration Works Contract
£560,000 ·
- Surface Works throughout Taunton
£70,000 ·
Ref: 8365e49b-72c6-4841-b83d-1cd3761f490f-840769 · Sourced from Contracts Finder
View source notice