# 618133 M4 J17 West Bridge Deck Resurfacing

> A sourced UK public sector contract award published by National Highways.

## Key facts

- Buyer: [National Highways](/buyers/national-highways/contract-awards)
- Supplier: [Hanson Contracting](/suppliers/hanson-contracting/public-sector-contract-awards)
- Award value: £54,358
- Tender value: £54,358
- Award date: 3 May 2024
- Published: 31 May 2024
- Contract start: 3 May 2024
- Contract end: 13 June 2024
- Stage: awarded
- Procurement category: works
- Notice ID: a7c3b699-bbfc-4b1e-a2b8-0783c168477f-755824
- OCID: ocds-b5fd17-4e94c7aa-0c7d-493b-98c0-39fff5ff90e3

## Description

Remove the full carriageway width between the kerbs from joint to joint and resurface during four night time closures of the west deck\. 60m long HRA surfacing replacement, kerb to kerb, full depth\. Where defective waterproofing is found this should be cut back to sound material\. Best endeavours shall be to remove defective waterproofing, assumed as all exposed waterproofing\. The method for removal shall be via scraping the deck, not by fine milling\. Any remaining waterproofing shall have a clean edge, achieved through the use of appropriate hand held tools\. The extent of any waterproofing to remain, to be agreed with the National Highways on site supervisor\. New surfacing to an approximate depth of 110-160mm based upon existing kerb height and adjacent surfacing\.

## Related contract awards

- [PDF - Framework - A120 Horsley Cross - Parkeston Rbt Harwich Safety Impt](/contracts/ocds-b5fd17-17b0789c-c4e1-4d50-acd5-06e497aace8c) — National Highways
- [PDF Framework - A27 Falmer Footbridge Headroom](/contracts/ocds-b5fd17-ac2eb537-ce78-41bb-8f91-d6d652725e96) — National Highways
- [PDF Framework - RM1016 Holyport interchange](/contracts/ocds-b5fd17-c92e4616-bb2e-4533-8dce-53b55a72aa09) — National Highways
- [PDF Framework - A5 EB WB M42 J10 - A5148 Wall SCRIM](/contracts/ocds-b5fd17-fa81f41a-011b-40ab-a8bf-d4c26b00e821) — National Highways
- [PDF Framework - M27 Salisbury Road Deck Repair](/contracts/ocds-b5fd17-9ba08707-2757-40f4-b227-21460b8dab8c) — National Highways Limited
- [PDF Framework - 622456 - A303 WB BullingtonX-BartonStcy](/contracts/ocds-b5fd17-d4ab088c-ee32-4fb1-839f-76a8b9f3cb58) — National Highways Limited
- [PDF Framework - M42 SB J9 - J8 Resurfacing](/contracts/ocds-b5fd17-d2bc3238-dcef-462a-8d84-bdf8c7b760d5) — National Highways Limited
- [PDF Framework - A303 Wylye EB &amp; WB MP 147\.8 - 152\.5 RS BUNDLE](/contracts/ocds-b5fd17-007683cf-fa71-46db-9a28-10f3af9054ca) — National Highways Limited
- [Installation Services, Small Works and Reactive Call Outs](/contracts/ocds-b5fd17-9a3a801b-3d9b-45bd-a1c0-330f57949444) — Gloucestershire Health and Care NHS Foundation Trust
- [M62 Red Lane Dike Bridge Refurbishment - Ground Investigation](/contracts/ocds-b5fd17-199f371a-d0db-473e-a734-b33746969b76) — National Highways Limited
- [Ebury Phase 2 Marking Suite Fitout Contractor](/contracts/ocds-b5fd17-34a84eb0-f527-44ce-bd81-cc5dc466edb4) — Westminster City Council
- [CA18338 - Chesterfield College Training &amp; Production kitchen ducting, heating and control panel](/contracts/ocds-b5fd17-a18f2594-e9d1-44d8-bb84-af476f45d642) — Chesterfield College

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/a7c3b699-bbfc-4b1e-a2b8-0783c168477f-755824)
