St Austell A30 Link Road
£49,776,749
Contract Details
- Tender Value
- £60,000,000
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
The Council is seeking to procure a Contractor under an NEC3 ECC (Design and Build) Contract for the construction of a new section of Road that links St. Austell to the A30 via the China Clay area. The Contractor will be expected to take a pre- planning reference design and produce a detailed design as well as undertaking the subsequent construction of the road. The preferred route will be 6.2 kilometres in length and will comprise a 10m wide single carriageway designed to a 60 mph design speed with climbing lanes on steeper gradient sections. The route requires 42.8 hectares of land for construction and total scheme cost is estimated at £60 million. Suppliers can access and download (free of charge) all the procurement documents and scheme details at www.supplyingthesouthwest.org.uk. Use DN number DN377197 to find this opportunity or alternatively search St Austell to A30 Link Road. Suppliers shall also submit bid electronically via the same opportunity. The Council also has a dedicated website with some high level scheme information. please visit: https://www.cornwall.gov.uk/transport-and-streets/roads-highways-and-pavements/major-highway-schemes/st-austell-to-a30-link/. to access this.
Related Contracts
From This Buyer
From This Supplier
- E24023-305 Sturminster Road
£1,680,551 ·
- GR/HGW/E23007 Overton Road
£399,982 ·
- Westonzoyland Rd, Bridgwater - Traffic Signals Installation
£140,000 ·
- Bodmin to Boscarne Span Bridge Replacement Works
£789,953 ·
In This Category
Ref: c0f35fcf-7363-479c-9816-f74ec6e962e2-368853 · Sourced from Contracts Finder
View source notice