Lincoln Washlands D&B
£1,746,245
Contract Details
- Tender Value
- £1,746,245
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
Upgrade electrical equipment at the Brant, Sand Syke, Witham and Till pumping stations to comply with current safety legislation, fire safety requirements and the relevant Environment Agency MTRs for SIA. Control buildings will be modified to improve their fire resistance and enhance their security against the vandalism and theft prevalent in each location. All pump starters will be changed to soft starters, to reduce the motor stress and increase the residual life of each pump. Desilting will be undertaken at Witham Washlands to remove the silt which currently prevents the sluice gates fully closing. Additional information: Form of Contract: NEC4 ECC Option C Further infomation may be obtained from : mailto:info@neccontract.com
Related Contracts
From This Buyer
From This Supplier
In This Category
- Provide the Fit Out of 1st Floor of Waterdale, Doncaster DN1 3BU
- Fencing in Public Park and Open Spaces within Taunton
£57,000 ·
- Estates Capital Project- LittleBrook Anti-Ligature Doors and Associated Hardware
£35,371 ·
- Consultancy re. Replacement of Roof and Solar Panels at Cranleigh Health Centre
£98,415 ·
Ref: 3d7efb73-a337-4928-9f22-0a6e3399a067-441455 · Sourced from Contracts Finder
View source notice