Awarded
HRE - CLOSED BRANCH LINES MINOR WORKS - MTM/3 - Install drainage pipe to alleviate the flooding issue as shown in the attached photographs.
£12,674
works
Contract Details
- Tender Value
- £12,674
- Stage
- Awarded
- Published
- Awarded
Timeline
Awarded
Start
Disclosed
End
Description
HRE - CLOSED BRANCH LINES MINOR WORKS - MTM/3 - Install drainage pipe to alleviate the flooding issue as shown in the attached photographs.
Related Contracts
From This Buyer
From This Supplier
- CLOSED BRANCH LINES MINOR WORKS - HLW/61 - Carry out site investigations as per Jacob's attached specifications.
£25,054 ·
- CLOSED BRANCH LINES MINOR WORKS - BHS/5 - Remove close growing and disruptive tree growth. Kill root systems to prevent re growth. Make good/stabilise loose masonry and copings all over. Repair timber fencing where broken.
£40,875 ·
- CLOSED BRANCH LINES MINOR WORKS - BHS/11 - Remove vegetation and treat remaining stems/trunks to prevent re growth. Rake out, pressure fill and point deep open joints to all parts.
£37,704 ·
- Project: pro_19758 - HRE - CLOSED BRANCH LINES MINOR WORKS - AVE/2 - Replace missing wing wall copings. Repair approach fences. General Masonry Brickwork Repairs throughout to fractures, spalling and loose elements. Apply date tabs to fractures for future monitoring.
£28,488 ·
Ref: fbb93296-8a38-40f6-b2b8-7620b3a6d3ff-807698 · Sourced from Contracts Finder
View source notice