ContractPulse
Awarded

For the UKAEA Culham Science Centre HyDUS Project Foundation Works

£119,105

works

Contract Details

Tender Value
£200,000
Stage
Awarded
Published
Awarded

Timeline

Start
Awarded
Disclosed
End

Description

A requirement has emerged for the provision of a containerised laboratory to be constructed within a compound with associated ancillary structures. The actual laboratory facility is to be provided and installed by others but as a precursor to the delivery and installation, civil engineering works are also required. The works are to provide a foundation and associated enabling works for a 9.14m x 3.04m containerised laboratory to be installed to the North of Building B24. A RIBA Stage 3 design has been developed and the Construction Provider is to further develop the design and build the following: • Foundations to set container and additional equipment. • Surface water drainage. • Install ducts for later installation of Power and data by others. • Fence to enclose the container and supplementary equipment. • Temporary Vehicle Access. • Temporary pedestrian footpath. The full works are described within the Schedule of Works and associated Scope documentation.

Related Contracts

Ref: 93862796-6c63-413a-8554-147ae24e0d9f-698002 · Sourced from Contracts Finder

View source notice