RUG - Glaramara Close Play Area - AWARD
£63,329
Contract Details
- Stage
- Awarded
- Published
- Awarded
Timeline
Description
- Removal of existing rubber wet pour safer surfacing and associated edging (timber and concrete pin kerbs) - Removal of existing tarmac and concrete paving and associated edging (concrete pin kerbs) - Removal of existing play equipment and site furniture - Concrete asphalt (tarmac) paving to new footpaths with concrete pin kerb edging - Bonded rubber mulch safer surfacing around play equipment with concrete pin kerb edging - Installation of new play equipment - Installation of site furniture to include metal seats, litter bins, and 3m maintenance gate - Provisional: construction of timber sleeper retaining wall - Provisional: construction of timber sleeper steps with concrete treads - Topsoil and turf stripping - Regrading/regulation of levels and formation of ramped footpath using locally sourced material - Topsoiling and seeding - Tree planting
Related Contracts
From This Buyer
From This Supplier
In This Category
- Provide the Fit Out of 1st Floor of Waterdale, Doncaster DN1 3BU
- Fencing in Public Park and Open Spaces within Taunton
£57,000 ·
- Estates Capital Project- LittleBrook Anti-Ligature Doors and Associated Hardware
£35,371 ·
- Consultancy re. Replacement of Roof and Solar Panels at Cranleigh Health Centre
£98,415 ·
Ref: 89840dce-88d6-4a6e-b304-43a60c6a9271-538829 · Sourced from Contracts Finder
View source notice