# Purchase of a Mobile Welfare Unit for Golitha Falls NNR

> Contract award record from UK public-sector procurement sources.

## Key facts

- Public buyer: [Natural England](/buyers/natural-england/contract-awards)
- Contract winner: GENQUIP LIMITED
- Award value: £26,820
- Tender value: £40,000
- Award date: 7 October 2024
- Published: 22 November 2024
- Contract start: 14 October 2024
- Contract end: 1 March 2025
- Stage: awarded
- Procurement category: goods
- Notice ID: 43b9f40d-8d84-4708-bc10-93a77f662a78-804879
- OCID: ocds-b5fd17-6136549e-f7a9-4888-93d3-cb80ea46f5b2

## Description

We are the East Cornwall NNRs Team of Natural England, who manage Goss Moor and Golitha Falls National Nature Reserves in Cornwall\. We are seeking a Ground Hog GP360 Eco Fusion Pulse 12ft mobile welfare unit with the following specs &amp; extras: specs &amp; extras: • Road legal • Two years warranty • Length 3655 mmLength \(including drawbar\) 4920 mm • Height \(on wheels\) 2\.9 m • Height \(on ground\) 2\.5 m • Generator 6 kVA • Unladen Weight 1750 kg • Possible Gross Weight 1800 kg\* • Solar Panel 360 Watt • Fresh Water 20 Litres • Waste Water 20 Litres • Toilet Tank Size 280 Litres • Fuel Tank Size 58 Litres • Canteen area with table and bench seating for up to 6 people • 12V LED lighting with PIR • 12V diesel powered air blown heating system • Warm water supplied by a 230V on-board heating system • Large stainless steel sink c/w warm water tap • Single inverter powered socket &amp; USB connection • Generator start panel c/w hour run meter • Fresh &amp; waste water containers \(20 Ltr cap each\) • Consumer board c/w RCD &amp; MCBs Carbon monoxide monitor and smoke alarm • 130Amp hour battery/ charger &amp; battery guard • Toilet area with plastic recirculating toilet • 12V LED lighting with PIR in toilet area • Forearm wash basin with c/w warm water tap in toilet area • Warm water supplied by a 230V on-board heating system • Generator/ Warm Room • 12V LED lighting with PIR in generator/ warm room • 12V diesel powered air blown heating system in generator/ warm room • Access to fuel tank with separate fuel level in generator/ warm room • gauge \(58 Ltr cap\) in generator/ warm room • Fuel Active system in generator/ warm room • Generator start battery in generator/ warm room • Fuel tank runtime = approx\. 25 hours in generator/ warm room • Spare wheel and tyre • Corporate branding and colour scheme • Safety pack We would like the unit delivered to the Lower Penrose Veor Farm, St Dennis, St Austell, Cornwall, PL26 8DB\. Additional information: To apply for this opportunity you must submit your quotation meeting the requirements detailed in the Request for Quotation \(RFQ\) attached\. Your response must be sent to toby\.cogan@naturalengland\.org\.uk by 12 midday on 07/10/2024\. If you have any clarification questions linked to this opportunity or the procurement process please submit these via email to toby\.cogan@naturalengland\.org\.uk\. Please note that, unless commercially sensitive, both the question and the response will be circulated to all tenderers\.

## Related contract awards

- [ETAFF AESW03](/contracts/ocds-b5fd17-72e28da6-ee53-4f9a-81d7-3ac2b4312ead): Natural England
- [ETAFF AES&amp;E03](/contracts/ocds-b5fd17-9cce51d1-872d-450a-8702-2836c26f6e93): Natural England
- [ETAFF AEMidlands03](/contracts/ocds-b5fd17-5b9ee168-322d-4474-aefd-f8c65684829d): Natural England

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/43b9f40d-8d84-4708-bc10-93a77f662a78-804879)