# T0681 GG119 Road Safety Audits and Safe Systems

> Contract award record from UK public-sector procurement sources.

## Key facts

- Public buyer: [National Highways](/buyers/national-highways/contract-awards)
- Contract winner: [WSP UK LTD](/contract-winners/wsp-uk/public-sector-contract-awards)
- Award value: £239,134
- Tender value: £250,000
- Award date: 23 July 2025
- Published: 30 July 2025
- Contract start: 23 June 2025
- Contract end: 31 March 2027
- Stage: awarded
- Procurement category: services
- Notice ID: 117f46f4-b4de-4552-b03b-718704b07ef4-856653
- OCID: ocds-b5fd17-651d7d86-cac8-47f9-ad1b-5430daacafbf

## Description

GG119 Road Safety Audit and Safe Systems National Highways has a long-term ambition that no one should be killed or seriously injured while travelling or working on the strategic road network\. The delivery of this ambition is underpinned by National Highways adoption of the Safe System approach\. National Highways' Safe System approach places human life and health at its centre and aims to achieve safety through considering operational, infrastructure, roadway, and vehicle design aspects\. The Safe System approach values the needs of all road users and is inclusive of all users\. The Safe System approach is based on the following 5 components: Safe Roads, Safe Speeds, Safe People, Safe Vehicles, and Post- Collision Response\. This task seeks to undertake research to determine whether it would be appropriate and practicable to incorporate a methodology for assessing a highway improvement scheme's alignment with the Safe System approach with the already established Road Safety Audit process\. The task also supports the following National Highways strategies and imperatives in continuing to provide for all road users, including those who travel alongside and over our roads: - Safety KPI and KSI reductions - Safety Imperative - Delivery Imperative - Accessibility Strategy - Connecting the Country - Design Construction and Maintenance - Connecting the Country - Customer Mobility - Home Safe and Well - KSI reduction - National Casualty Reduction Plan - More effective deployment of SES resource to meet RIS2 delivery\.

## Related contract awards

- [PDF - Framework - A120 Horsley Cross - Parkeston Rbt Harwich Safety Impt](/contracts/ocds-b5fd17-17b0789c-c4e1-4d50-acd5-06e497aace8c): National Highways
- [PDF Framework - A27 Falmer Footbridge Headroom](/contracts/ocds-b5fd17-ac2eb537-ce78-41bb-8f91-d6d652725e96): National Highways
- [PDF Framework - RM1016 Holyport interchange](/contracts/ocds-b5fd17-c92e4616-bb2e-4533-8dce-53b55a72aa09): National Highways
- [Homes England - DARTS Lot 1 - Land at Northeye, Bexhill](/contracts/ocds-b5fd17-d95bc416-9999-4ec2-8091-c1b486a197d8): Homes England \(the name adopted by the Homes and Communities Agency\)
- [S30093 Development of new Lead Safety Indicators validation and verification of selected recommended indicators](/contracts/ocds-b5fd17-1d70e25a-3a5a-4416-a448-558c8f77576a): National Highways Limited
- [Asset Condition Survey](/contracts/ocds-b5fd17-ef62520a-dc00-4c3e-8ed1-26eea0688814): Lewisham and Greenwich NHS Trust

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/117f46f4-b4de-4552-b03b-718704b07ef4-856653)
