Awarded
Pillings Radial Gate Refurbishment
£101,346
Defra Network eTendering PortalECS Engineering Services Limited
works
Contract Details
- Stage
- Awarded
- Published
- Awarded
Timeline
Awarded
Start
Disclosed
End
Description
Urgent works are required to Install the stop logs, de-water the structure, replace the balance tanks, carry out an Intermittent Planned Preventative Maintenance (PPM) on the whole structure including all control penstocks, Scaffold and re-paint the whole structure.
Related Contracts
From This Buyer
From This Supplier
- Colwick Sluice - Phase 1
£843,260 ·
- Mids- MEICA Lot 1 - Leen Syphon Generator
£186,770 ·
- Mids- MEICA Lot 1 - Colwick Generator
£78,320 ·
- Mids - MEICA Lot 1 - Croft Bridge Pumping Station
£605,332 ·
In This Category
Ref: 5421b3b8-e792-4dd1-bd9a-da42dddffbf5-406300 · Sourced from Contracts Finder
View source notice