# A417 Missing Link - Rock Catch Fence, Soil Nailing &amp; Shotcreting

> Tender notice from UK public-sector procurement sources.

## Key facts

- Public buyer: [KIER TRANSPORTATION LIMITED](/buyers/kier-transportation-limited/contract-awards)
- Tender value: £200,000
- Published: 18 November 2025
- Planned start: 12 January 2026
- Planned end: 27 March 2026
- Stage: open_tender
- Procurement category: works
- Notice ID: f02f1609-9aaa-464e-9f1d-8a12de7f51a4-872518
- OCID: ocds-b5fd17-752287f6-69ae-43a2-83ee-6296ba79088a

## Description

Purpose of Notice - The procurement of a Subcontractor for the rock catch fencing, soil nailing &amp; shotcreting works in connection with the A417 Missing Link at Air Balloon\. Scheme Description - Under the National Highways Limited Regional Delivery Partnership \(RDP\), we are appointed as the Principal Contractor for the design and construction of a new dual carriageway at the A417 Missing Link at Air Balloon\. The scheme would provide 3\.4 miles \(5\.5km\) of new, rural all-purpose dual carriageway for the A417\. The new dual carriageway would connect the existing A417 Brockworth bypass with the existing dual carriageway A417 south of Cowley\. Registering Interest - Interested parties are to register their interest through making contact via guy\.hornsey@kier\.co\.uk\.

## Related contract awards

- [A417 Missing Link - Series 1500 Motorway Communications](/contracts/ocds-b5fd17-cf7c6d83-d438-42c1-8c10-653f740053d2): KIER TRANSPORTATION LIMITED
- [A417 Missing Link - Concrete Surface Water Channel &amp; Concrete Safety Barrier](/contracts/ocds-b5fd17-0846583d-9558-436e-9c2b-c87224c67c1f): KIER TRANSPORTATION LIMITED
- [A417 Missing Link - Structures Surface Coatings](/contracts/ocds-b5fd17-57e9789a-fd6b-4d55-ba60-6473747033b8): KIER TRANSPORTATION LIMITED

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/f02f1609-9aaa-464e-9f1d-8a12de7f51a4-872518)
