ContractPulse
Awarded

B418 Post Operation Clean Out and Characterisation works

£1,170,515

CTM Portal for the NDA Shared Services AllianceNuvia
works

Contract Details

Stage
Awarded
Published
Awarded

Timeline

Awarded
Start
Disclosed
End

Description

Key activities of the Contractor under the B418 Characterisation and POCO scope of the works include: • The management and execution of the works • The provision of the sampling and analysis plan • The health physics survey of the facility. • The recovery of suitable samples to allow waste characterisation. • The recovery samples to allow building characterisation • The size reduction, segregation and packaging of all waste material • The undertaking of HRGS to all packages, pallets or items moved into B418.19 • The undertaking of HRGS to all samples before dispatch. • The radiological activity and transport calculations required to comply with ADR for the movement of all materials - both on the Premises and for dispatch to laboratory. • The movement too and storage of all packaged items to B418.19 • The transport of all samples to a suitable laboratory for analysis. • The recording, tracking and documentation of the works

Related Contracts

Ref: 5496c175-9563-437b-bcb6-36072394913a-548859 · Sourced from Contracts Finder

View source notice