# Design and Build Pottery Terrace Rock Ramp Fish Easement

> A sourced UK public sector contract award published by RIBBLE CATCHMENT CONSERVATION TRUST LIMITED.

## Key facts

- Buyer: RIBBLE CATCHMENT CONSERVATION TRUST LIMITED
- Supplier: Bailey Contracts Ltd
- Award value: £49,795
- Tender value: £65,293
- Award date: 1 February 2022
- Published: 10 February 2022
- Contract start: 1 February 2022
- Contract end: 30 September 2022
- Stage: awarded
- Procurement category: works
- Notice ID: 24e6dd18-7c01-4137-bc38-5dd7bcb6ec62-509069
- OCID: ocds-b5fd17-875038d1-13f9-43f7-80c5-7fba8410ca65

## Description

The construction of a rock ramp type fish pass at Pottery Terrace Weir \(PTW\) on the River Douglas \(Wigan\), is part of the Opening Up the River Douglas programme \(OUR Douglas\), part funded by the European Regional Development Fund \(ERDF\) this project is below the thresholds for a full procurement procedure under the Public Contracts Regulations 2015\. RRT is still under and obligation to ensure compliance with EU principles of transparency, equality and non-discrimination, as such RRT is conducting a formal tender process in which all bidders will be treated equally, with no discrimination and through a transparent process\. The project aims to specifically address and improve fish passage in the Douglas Catchment, creating a fish easement which allows for the passage of all fish species at all times\. This tender is for the Detailed design and Construction of a rock ramp type fish pass at Pottery Terrace Weir on the river Douglas, Wigan\. To apply visit https://ribbletrust\.org\.uk/our-douglas-contract-opportunity-6/

## Related contract awards

- [Design and Construction Weir Removal at Cobbs Clough Weir](/contracts/ocds-b5fd17-7b71daa8-0da8-4089-9a69-d9a2110c3341) — RIBBLE CATCHMENT CONSERVATION TRUST LIMITED
- [Design and Construction Rock Ramp Fish Pass at Worthington Lakes](/contracts/ocds-b5fd17-f83d6e7f-4d98-4d1a-a0f0-5b3ae263da67) — RIBBLE CATCHMENT CONSERVATION TRUST LIMITED
- [Construction Embedded rock ramp fish pash near Red Rock](/contracts/ocds-b5fd17-3e56ab93-4bc6-494f-86ee-5fcb554f9b83) — RIBBLE CATCHMENT CONSERVATION TRUST LIMITED
- [Design and Construction Rock Ramp Fish Pass Upstream Pincroft Works](/contracts/ocds-b5fd17-f0e0330b-982f-4571-ab92-729e981ca797) — RIBBLE CATCHMENT CONSERVATION TRUST LIMITED
- [ITT for the Provision for a Principal Contractor for Dismantling, Groundworks, Landscaping and the Management of the Installation of the Footbridge at Somersall Park](/contracts/ocds-b5fd17-177272a9-de5c-4be7-9a73-c834651d12d8) — Chesterfield Borough Council
- [Contract Award Notice - THMS - Incident Response for Vegetation Maintenance](/contracts/ocds-b5fd17-e8312a55-0567-4c32-b037-74eb9d218b4f) — Environment Agency
- [Accent Housing - Asbestos Removal](/contracts/ocds-b5fd17-1e0c9350-8565-431c-bc6d-f4e9f27de70e) — PROSPER
- [Burton on the Wolds - Kitchen Refurb &amp; other works](/contracts/ocds-b5fd17-f42c2b77-f310-4215-b68b-2244124f339c) — Leicestershire County Council
- [DNWP0073 - Lot 1B/In-SEP ID - Controlled Area Initial Decommissioning Operations](/contracts/ocds-b5fd17-8101f85b-06d1-45ac-97d0-2bd82e3b566e) — Altrad AtkinsRealis Joint Venture \(A2R JV\)

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/24e6dd18-7c01-4137-bc38-5dd7bcb6ec62-509069)