# 869271180 T1348 Assessing the benefits of enhanced freight speed differentials on the GB network

> A sourced UK public sector contract award published by Rail Safety and Standards Board.

## Key facts

- Buyer: [Rail Safety and Standards Board](/buyers/rail-safety-and-standards-board/contract-awards)
- Supplier: Railfreight Consulting Limited
- Award value: £196,543
- Tender value: £196,543
- Award date: 21 October 2024
- Published: 19 November 2024
- Contract start: 4 November 2024
- Contract end: 3 August 2025
- Stage: awarded
- Procurement category: services
- Notice ID: 6f6df92b-31b7-4aad-9edb-c2aaf9c27e60-803810
- OCID: ocds-b5fd17-8a0af518-a2bd-406f-b271-55e97b29e540

## Description

RSSB is seeking to procure research to assessing the benefits of enhanced freight speed differentials on the GB network\. This project will determine and agree the criteria that a train must satisfy in order to safely travel at enhanced freight speeds, up to the maximum speed of the wagons\. It will review if assumed braking capabilities in GKRT0075 and GMRT2045 are too conservative and can allow eligible freight trains to travel at an EF speed\. This will be done by proposing a set of EF speed differentials for freight trains, using the Lambda value as explored in the T1266 'Exploring the cost of using default ETCS braking values for freight' project\. It will also assess the monetary benefits of using EF speeds by developing and applying a benefits analysis approach\. If a set of EF speed differential can be proposed and justified technically and benefits wise, changes to relevant documentation and signalling will be proposed to enable industry to start using EF speeds\. The research has been split up into the following five Phases\. It is expected that a Steering Group meeting will be held at the completion of each phase to review the outputs\. •Phase 1 - Line speed and signal distance suitability analysis for EF speed differentials •Phase 2 - Infrastructure compatibility with EF speed differentials •Phase 3 - Identifying a range of possible enhanced freight speeds •Phase 4 - Benefits assessment of EF speed differentials •Phase 5 - Operational considerations and next steps

## Related contract awards

- [GB-London: Insurance Broker Services](/contracts/ocds-b5fd17-9e1f2aa8-975a-4fad-8b38-6b0c18d2ae4f) — Rail Safety and Standards Board
- [GB-London: Employee Engagement Surveys](/contracts/ocds-b5fd17-66fb199b-e3b7-440f-bf73-24ad72f96a21) — Rail Safety and Standards Board
- [GB-London: 977215574 Rail Technical Strategy \(RTS\) Interface Development](/contracts/ocds-b5fd17-55e1dc7f-7ce4-4008-8a4b-165011206cfb) — Rail Safety and Standards Board
- [GB-London: 847167048 Learning Management System 2026](/contracts/ocds-b5fd17-7473cbba-c523-4bf1-967d-b434b5dc1676) — Rail Safety and Standards Board
- [Rail Terminal Expert Services](/contracts/ocds-b5fd17-c21620d4-1970-464e-9433-717bedb4b3fd) — HS2
- [GB-London: T1264-Inform the introduction of Digital Automatic Coupling on the GB network](/contracts/ocds-b5fd17-6300f2c5-dc92-43b4-9d44-19faa3d07ef5) — RSSB
- [DN782194 EPC Surveys \(Direct Award\)](/contracts/ocds-b5fd17-a9cba2b0-2c95-41d4-8bf6-3b678d7f321c) — London Borough of Hackney
- [Tourism Campaign 2027 - Video Agency tender](/contracts/ocds-b5fd17-a08bea07-7b5c-4c91-afbd-77c605e14093) — North York Moors National Park
- [MRWA Food Waste Prevention campaign 26/27](/contracts/ocds-b5fd17-d0751a7a-92c1-46ca-a009-a08b92e39f84) — Merseyside Waste Disposal Authority
- [5-year maintenance contract for Karl Storz stack systems \(26 items\)](/contracts/ocds-b5fd17-32db329b-fe7b-469d-8277-91e367b98845) — North West Anglia NHS Foundation Trust

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/6f6df92b-31b7-4aad-9edb-c2aaf9c27e60-803810)
