Skip to content

Tender notice

W99 Pannel Build

Notice details

Published
Category
goods
Buyer region
North West

Public buyer

Tender valueNot disclosed

  1. Planned start
    As published in the notice
  2. Planned end
    As published in the notice

Work description

The SMF is used to transfer material to the AHF facility. It must be purged with nitrogen (N2) prior to export from the AHF to protect the SMF internals. The nitrogen purge system has been designed for this purpose. It comprises several panels with valves and instruments, connected by pipework. The gas supply is provided from standard transportable gas bottles. Specification Outline This specification defines the manufacturing and delivery requirements for the principal pipework panels for performing the N2 purge of the SMF. This document has been produced with reference to the client design requirement specification and the functional specification. A completed design ready for manufacture has been developed in accordance with this specification. Following the detail design it is considered unnecessary for any further design except that necessary by the fabricator for manufacture. This specification defines the manufacturing, works testing and delivery requirements for the SMF Nitrogen Purge System Test Aid. A completed design ready for manufacture has been developed in accordance with this specification. Following the detail design, it is considered unnecessary for any further design except that necessary by the contractor for manufacture (e.g. profile drawings for stainless steel plates).

Related awards

Source: Contracts Finder · Notice e7dc2bbd-ff43-44f2-8173-7aa3bc1f34c7-798707

View source notice