ContractPulse
Awarded

Extension of the Blackpool & Fleetwood Tramway from North Pier to North Station

£10,000,000

works

Contract Details

Tender Value
£10,000,000
Stage
Awarded
Published
Awarded

Timeline

Awarded
Disclosed
Start
End

Description

The Contracting Authority wish to undertake an extension of the Blackpool and Fleetwood Tramway from NorthPier to a terminus adjacent to Blackpool North Railway Station. Detailed design and construction of:- a) approx 550m of twin track, crossings, turnouts, drainage, ducts and trackbed, together with connections of the existing tramway track; b)tram stops; c)association highway works; d) the reconstruction of Talbot Square; e)the reconstruction of highway junctions; f) the OLE and associated electrical supply and control infrastructure; g) earthing and bonding. (\"The Works\")

Related Contracts

Ref: 9779c3dc-f37d-4025-bee2-ef6b12409a27-175572 · Sourced from Contracts Finder

View source notice