Tender notice
EKFB JV - Mechanical & Electrical Works for Green Tunnel Portal Building Fire Gas Suppression System Package
Notice details
- Published
- Category
- works
- Buyer region
- Not specified
- Source
- View official notice
Public buyer
Tender value£500,000
- Planned startAs published in the notice
- Planned endAs published in the notice
Work description
EKFB is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood. Our scope of the works includes 15 viaducts, 5 km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation.
EKFB are looking for a competent contractor to provide the fire gas suppression system.
Design, supply, installation, testing, commissioning, certification, and integrity testing of the fire suppression system. This work should be based on the design intent shown in the respective drawings and specifications and comply with HS2 standards. The specialist will be responsible for the complete system, including coordination with mechanical and electrical contractors regarding damper locations, operation, and power requirements.