Pre-procurement notice
Forest nursery site development Opportunity - Horizontal well, field drainage and associated drain
Notice details
- Published
- Category
- Not specified
- Buyer region
- South West
- Source
- View official notice
Public buyer
Public buyer
FORESTRY COMMISSIONTender valueNot disclosed
Planned contract dates were not published with this notice.
Work description
Expressions of Interest: WOODSIDE FOREST NURSERY SITE DEVELOPMENT
Forestry England is seeking Expressions of Interest regarding development of Woodside Forest Nursery Site, to include horizontal well, field drainage and associated drain.
The purpose of this notice is to test the market and gain an idea of how many suppliers have the capability of carrying out this work.
If you wish to express interest in the scope (detailed below), please send an email to Christine Hunt at Christine.hunt@Forestryengland.uk. no later than 12:00 noon, 31st July 2020. Your response should confirm that you have the capability to meet the below scope & would be interested in tendering for this opportunity if it is advertised. Responses will be reviewed - this may mean asking further questions verifying your capability. This will assist in confirming if a tender will be issued.
Scope: This Forestry England project for the initial development of Woodside Forest Nursery Site requires: • Trenching machinery capable of depths up to 5.8m • Experience and expertise in horizontal wells • Membership of the Land Drainage Contractors Association or equivalent body would be adventitious
The project incorporates:
A horizontal well • 300m long 5.5m deep • Capable of supplying 50m3/hr • Secure housing for pump equipment • Powered by mains or generator • Detailed specification will be supplied at tender
Field drainage • 16.2ha of field to be drained • Minimum cover depth of 0.8m, maximum depth expected to be 1.5m • Using slotted plastic land drainage pipe to BS4962, • Ranging in diameter from 80 to 200mm. • Option of drain wrap (pending results of soil analysis). • Silt chamber to be constructed to accommodate main outfall and incorporate a gate valve. • Drainage scheme is to follow supplied design plan.
Drain • Levels to be set in accordance with issued plans and to be checked during construction. • Installation of 300mm diameter pipe, approximately 130m long. • Lain on prescribed bedding. • Connection from field drainage silt chamber to low profile headwall at outfall with grate and cast-iron flap valve. • Trenching to be backfilled and made good.
Related awards
From this public buyer
- Provision of Lone Working System
£6,786,900 ·