# FLOWIC Test Rig Definition

> Contract award record from UK public-sector procurement sources.

## Key facts

- Public buyer: [OFFSHORE RENEWABLE ENERGY CATAPULT](/buyers/offshore-renewable-energy-catapult/contract-awards)
- Contract winner: 2H OFFSHORE ENGINEERING LIMITED
- Award value: £33,480
- Tender value: £33,480
- Award date: 6 March 2023
- Published: 28 March 2023
- Contract start: 7 March 2023
- Contract end: 6 July 2023
- Stage: awarded
- Procurement category: services
- Notice ID: 5fe5e49e-3b33-4848-849f-2e54620fae5b-628868
- OCID: ocds-b5fd17-95afd8db-d204-4e93-aeac-b72114c603c9

## Description

The Offshore Renewable Energy Catapult \(OREC\) is currently responsible for scoping and building out the National Floating Offshore Wind Innovation Centre \(FLOWIC\) facility in Aberdeen\. Design studies are being tenderer for the build of these facilities, focussing on the testing of moorings and dynamic cables\. OREC and the wider industry have a knowledge gap on the range of extreme and fatigue loads likely to be seen for mooring and cable infrastructure on future floating wind sites\. The proposed project is to define a range of mechanical loading conditions in various geographic floating wind for both mooring and dynamic cable systems\.

## Related contract awards

- [Information, Communication &amp; Technology Framework - ORE/24/033](/contracts/ocds-b5fd17-1dd3f641-580a-4e95-afbd-8fedbf1b04c8): Offshore Renewable Energy Catapult
- [National Offshore Anemometry Hub \(NOAH\) Operation &amp; Maintenance Services](/contracts/ocds-b5fd17-194c6973-9bb9-4316-b3ff-e8bec9d9905f): Offshore Renewable Energy Catapult
- [Full Scale Mooring Test Line Rig ORE/23/089](/contracts/ocds-b5fd17-5d40b2ed-940c-406f-bdc1-a52489dfc968): Offshore Renewable Energy Catapult

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/5fe5e49e-3b33-4848-849f-2e54620fae5b-628868)
