Skip to content

Tender notice

Road & Rideside Vegetation Management Framework

Notice details

Published
Category
services
Buyer region
South West

Public buyer

Tender value£97,000

  1. Planned start
    As published in the notice
  2. Planned end
    As published in the notice

Work description

We will be awarding a contract for external roadside and internal ride side vegetation management in South West England. It is expected that this work will be undertaken by a tractor mounted side-arm flail mower or Horizontal Shaft Flail. The work involves the management of road and rideside vegetation to allow the Forestry Commission to ensure all access is kept open whilst being kept in a beneficial state for wildlife and visually attractive for visitors to the forests. The areas vary greatly in size and operational constraints present but have been represented on a sample map as best as possible for each lot for the purposes of the tender. The sites mapped are indicative of requirements over the lifespan of this contract. However, not all of these sites will need to be worked every year. As such, specific requirements will be identified later in the season which may include any or all of those listed or possibly other locations not identified here. Our intention is to award this contract for a period of one year. There will be an option to extend the contract by up to a further three years – four years in total. This means 1 year + 1 year + 1 year + 1 year. The decision to extend the contract will be based on satisfactory performance in the preceding year and budget availability.

For the purpose of this contract: Lot 1 = Wiltshire and is managed by Thomas Blythe Lot 2 = Bristol & Mendips and is managed by Thomas Blythe Lot 3 = Wyre Block and is managed by Richard Boles Lot 4 = Worcestershire Other Blocks and is managed by Richard Boles Lot 5 = Warwickshire and is managed by Richard Boles It is intended that one Contractor be selected against each Lot on this contract, although the same Contractor may be considered for multiple lots if they can prove their ability to complete all of the work in the allotted timeframe. The Contractor must have sufficient resources to complete the work within the stated contract period.

The documentation supporting this tender can be downloaded at https://www.dropbox.com/sh/uoke3u9xrktuj74/AAB4eMgp2pGpK6jUKE1Acjaca?dl=0

Related awards

Source: Contracts Finder · Notice 34adc37c-d2db-4ef7-ba6b-8e918a3bf3c7-94740

View source notice