# EKFB JV - T2G - Stop Logs

> Tender notice from UK public-sector procurement sources.

## Key facts

- Public buyer: [Eiffage Kier JV HS2 Main Civils Works, Lots C2 &amp; C3](/buyers/eiffage-kier-jv-hs2-main-civils-works-lots-c2-c3/contract-awards)
- Tender value: £250,000
- Published: 28 April 2025
- Planned start: 26 June 2025
- Planned end: 26 June 2026
- Stage: open_tender
- Procurement category: works
- Notice ID: b37ab362-0f78-4b65-8ae8-4c133f9414f9-842638
- OCID: ocds-b5fd17-96bbd7a4-ea22-4aa8-878a-3c876113617a

## Description

EKFB is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood\. Our scope of the works includes 15 viaducts, 6\.9km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation\. Within T2G there is a requirement for Stop Logs \(supply &amp; install\), Trash Barriers and Hand Rails \(supply only\), they are to be installed at one end of the culverts\. In total there are 9 culverts, but yet to be confirmed if all 9 require them\. The stop log, trash barriers and hand rails are to be made of galvanised steel\.

## Related contract awards

- [EKFB JV - G2S - Green Tunnel Laser Screeding](/contracts/ocds-b5fd17-9450ea23-d3b6-4d5d-aba2-74abc6ea2c4e): Eiffage Kier JV HS2 Main Civils Works, Lots C2 &amp; C3
- [EKFB JV - Temporary Works Design - For Gas Main Protection Slabs \(must be Lloyds registered approved\)](/contracts/ocds-b5fd17-ba40e027-9771-4187-bd6f-452c7c27b96b): Eiffage Kier JV HS2 Main Civils Works, Lots C2 &amp; C3
- [EKFB - Greatworth to Southam- Highway Vehicle Restraint System](/contracts/ocds-b5fd17-d2a7c0bf-278f-40ae-b836-eaf89721f299): Eiffage Kier JV HS2 Main Civils Works, Lots C2 &amp; C3

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/b37ab362-0f78-4b65-8ae8-4c133f9414f9-842638)