# Land Vehicle Exercise \(LVEX\) SBRI Phase2 - ISTEC Signature Reduction Molle

> Contract award record from UK public-sector procurement sources.

## Key facts

- Public buyer: [MINISTRY OF DEFENCE](/buyers/ministry-of-defence/contract-awards)
- Contract winner: ISTEC Services Ltd
- Award value: £35,000
- Tender value: £35,000
- Award date: 21 April 2016
- Published: 18 November 2016
- Contract start: 26 April 2016
- Contract end: 17 January 2017
- Stage: awarded
- Procurement category: services
- Notice ID: 24d051d2-df6a-4eed-9a5c-0ef06dd015c5-94883
- OCID: ocds-b5fd17-97a40673-adc9-11e6-9901-0019b9f3037b

## Description

PHASE 2 ACTIVITY Phase 1 activity ISTEC developed the camouflage concept into a demonstrator suitable for fitment to a Protected Weapon Station\. For Phase 2 it is expected that a prototype solution covering a complete platform will be supplied\. The whole platform solution will then be tested and demonstrated against current in-service camouflage to quantify the benefits of the system with respect to Visual, Near Infra-Red \(Image intensifier\) and Far Infra-Red \(Thermal\) signature\. Radar signature is not to be considered\. The MOLLE stowage concepts shall be carried forward through further development, considering weight distribution, ergonomics and accessibility\. These will exist only on inner surfaces of the platform, and where is deemed useful by the designer, after consideration of common uses and configurations\. Ease of application, replacement and maintenance shall also be considered with a focus on the simplicity of the aforementioned by non-technical users wherever possible\. Trials are likely to examine some aspects of this\. Environmental robustness must be considered throughout\. Due to the lack of environmental sealing, some consideration must be given to the effect of water saturation on the solutions weight, usability and fitting\. Whilst creating a whole platform solution it will be required to consider as a design exercise and feasibility study, the fitment of the solution to another/modified platform \(TBD at kick-off\), which is likely to be fitted with armour packs for theatre and/or may have a number of additional retrofitted equipment\. The contractor is expected to provide a prototype system\.

## Related contract awards

- [Provision of Cyber Security Training Services](/contracts/ocds-b5fd17-6160dea6-4531-4015-af4b-f90e1df9ba8a): MINISTRY OF DEFENCE
- [71471450 - NEXUS \(WP1\) - Grow the ACHE - CF](/contracts/ocds-b5fd17-97c43e26-1336-4162-adef-f3b2970ed3fe): Ministry of Defence
- [Dynatrace Licence &amp; Support Renewal 26-27](/contracts/ocds-b5fd17-e5126342-2f9f-45d2-b572-352f9478c3e4): Ministry of Defence
- [IRM21/7576 - Supply of Spares for the Universal Gun Mount and Associated Items](/contracts/ocds-b5fd17-cad091c0-eaaf-49ac-b56a-6e22e55ee7a4): BABCOCK INTERNATIONAL GROUP PLC
- [ISTEC Combined Support Contract](/contracts/ocds-b5fd17-a04dbfa0-dff9-4d92-99cd-846105451c02): MINISTRY OF DEFENCE
- [SWING ARM GUN MOUNT SPARES, REPAIRS AND POST DESIGN SERVICES](/contracts/ocds-b5fd17-52f9bc8d-13bc-4da6-b21a-5d3f5d48b81a): Ministry of Defence, Weapons, International Guns, Missiles and Rockets \(IGMR\) Project Team

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/24d051d2-df6a-4eed-9a5c-0ef06dd015c5-94883)
