# TENDER FOR THE SUPPLY AND INSTALLATION/COMMISSIONING \(where appropriate\) OF A SET OF \(CHEMICAL\) ENGINEERING LABORATORY EQUIPMENT \(FOR THE CTL\)

> Tender notice from UK public-sector procurement sources.

## Key facts

- Public buyer: [University of Birmingham](/buyers/university-of-birmingham/contract-awards)
- Published: 13 March 2018
- Planned start: 15 May 2018
- Planned end: 30 July 2018
- Stage: open_tender
- Procurement category: goods
- Notice ID: bab22bcf-6ffb-4d76-b92f-7adb7f7c8744-204854
- OCID: ocds-b5fd17-98c12df2-655f-4e26-bfc8-343caa92bbd8

## Description

TENDER FOR THE SUPPLY AND INSTALLATION/COMMISSIONING \(where appropriate\) OF A SET OF \(CHEMICAL\) ENGINEERING LABORATORY EQUIPMENT The University of Birmingham invites tenders for the supply of a series of equipment to provide for the delivery of a new undergraduate lab programme for the School of Chemical Engineering\. Please note that only suppliers who are able to supply the whole equipment list should submit a tender response\. The supplier shall respond to each point of this specification, describing in detail the method of compliance or otherwise\. The lab equipment will be used by groups of 3 students, and should be robust and use industrially relevant componentry where applicable\. The following \(high level overview\) of equipment is required:- Area/Theme Equipment Type Number of Rigs Heat Transfer B2: Heat Exchanger \(tube in tube \+ variations\) 4 Fluid Flow C3: Pressure drop in pipe \(air as working fluid\) 3 Mass Transfer E1: Gas Absorption 2 Mass Transfer F1: Distillation 1 Reactors H1: Ideal Reactor Kit \(CSTR, PFR \+ variations\) 2 Thermodynamics J1: Refrigeration 2 Fluid Flow K1: Pump Trainer \(various pump types\) 4 Heat transfer/Phase Change L1: Evaporation 2 Unit Operation M1: Crystallisation 1 Unit Operation N1: Filtration 2 Unit Operation O1: Stirred tank \(both heat and mass transfer set up\) 3 Process Control P1: Control training \(Level, flow, pressure, temperature\) 4 Process Control Q2: Advanced multi-variable control 1 Unit Operation R1: Fluidised bed 3 Hands on, option lab S1: Build a \.\.\. \(e\.g\. pump, valve\) 2 Further specification details of the equipment are provided below:- Please note that only suppliers who are abl\.\.\. Additional information: 1\.1 All main correspondence should go via the University's In-Tend website\. Your tender documents and information must be submitted via In-Tend by the date and time specified; www\.in-tendhost\.com/universityofbirmingham Is a Recurrent Procurement Type? : No

## Related contract awards

- [Framework Agreement for the Provision of Construction Project Management Consultancy Services](/contracts/ocds-b5fd17-8387c24c-4125-4c1b-93eb-dd4c1524c16c): THE UNIVERSITY OF BIRMINGHAM
- [Aston Webb Student Precinct - West Phase - QS &amp; PD](/contracts/ocds-b5fd17-dc1ff931-2066-482f-8e43-84eb7cf00f75): THE UNIVERSITY OF BIRMINGHAM
- [Life \+ Health Sciences Cluster - QS &amp; PD](/contracts/ocds-b5fd17-1a4783ed-fbf7-4a36-86f3-18783acd9841): THE UNIVERSITY OF BIRMINGHAM

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/bab22bcf-6ffb-4d76-b92f-7adb7f7c8744-204854)
