# GB-Swindon: UKRI-3216 Re-Install and Upgrade Alicia 4

> Contract award record from UK public-sector procurement sources.

## Key facts

- Public buyer: [UK Research &amp; Innovation - Science and Technology Facilities Council](/buyers/uk-research-and-innovation-science-and-technology-facilities-council/contract-awards)
- Contract winner: IBS Precision Engineering BV
- Award value: £64,300
- Tender value: £64,300
- Award date: 10 July 2023
- Published: 25 September 2023
- Contract start: 11 July 2023
- Contract end: 30 September 2023
- Stage: awarded
- Procurement category: services
- Notice ID: 96cbdd87-aab3-4a75-8caf-51f0afc16f3c-683291
- OCID: ocds-b5fd17-a0a5d5ea-35b9-41e6-b36a-80f23572adfc

## Description

STFC Daresbury Laboratory in collaboration with the University of York was successful in winning a project to build the silicon tracker detector for the experiment called Reactions with Relativistic Radioactive Beams \(R3B\)\. R3B is located at the international facility called Facility for Antiproton and Ion Research in Europe GmbH \(FAIR GmbH\)\), Darmstadt \(DE\)\. The project is planning to re-use the ALICIA-4 machine to build the silicon tracker detector for the R3B experiment\. ALICIA-4 was originally procured by the project called ALICE Inner Tracking System for CERN \(2015 - 2018\)\. This pre-cursor project was delivered as a collaboration between Daresbury Laboratory and the University of Liverpool\. ALICIA-4 is a custom-made, automated, pick-and-place machine capable of aligning detectors \(i\.e\. electronic microchips\) to an accuracy as high as 5um\. The total value of the machine at its procurement time \(~2016\) was ~300k EUR inc\. VAT\. The deployment of the ALICIA-4 machine for the R3B detector project allowed the UK to develop a unique selling point within the R3B collaboration\. This strategic positioning benefitted from the automation and high precision capability guaranteed by the ALICIA-4 machine\. The ALICIA-4 machine needs some functional adaptation work in order to be compatible with the R3B detector layout, and to be compatible with the latest version of the Windows operative system\.

## Related contract awards

- [GB-Swindon: UKRI-3755 Double Beam Turning Chamber](/contracts/ocds-b5fd17-59246669-ae7b-4ce9-98fa-eadcdb50b305): UK Research and Innovation, Science and Technology Facilities Council
- [GB-Swindon: UKRI-4653 Customised SpexiDAQ Software for HEXITEC](/contracts/ocds-b5fd17-744d3ba9-4fde-4f53-8add-34ce4de74f8f): UK Research &amp; Innovation Science &amp; Technology Facilities Council
- [GB-Swindon: UKRI-4173 Repair and Calibration of KERN Micro HD High Performance CNC Milling Machine](/contracts/ocds-b5fd17-22ee2a52-549b-4906-9187-367d1f93f3f0): UK Research and Innovation, Science and Technology Facilities Council
- [BE23201 - Repair of Specialist Equipment](/contracts/ocds-b5fd17-6dd4db8d-e75b-4ded-ad28-860f46e0ed0c): UK SHARED BUSINESS SERVICES LIMITED

## Source

[View the original notice on Contracts Finder](https://www.contractsfinder.service.gov.uk/Notice/96cbdd87-aab3-4a75-8caf-51f0afc16f3c-683291)
