THE WESTERN EXPANSION AREA FAIRFIELDS LOCAL PARK 4 CONSTRUCTION WORKS (HARD WORKS, EARTH WORKS , PUMP TRACK & DRAINAGE CONTRACT - AWARD

£466,644

works

Contract Details

Stage
Awarded
Published
Awarded

Timeline

Awarded
Start
Disclosed
End

Description

To supply & Install the Local Park 4, the Hard works, Pump track, Drainage & Earthworks to Local Park 4 (LP4). These include 3M wide to MKPT spec Tar Spray & Chip footpaths with timber edging, 1.8M wide Woodland footpath bound gravel surface edged with timber edging, Tarmac surfacing to pump track, Timber benches to the Tar Spray & Chip footpath and on grass of the woodland footpath and two timber KIT Bridges over the existing Ditch as illustrated on the GA Drawing 21114 921 P3 Rev A.