Live
SE - AOMR Lot 1 - Mill Leese FSA Fence Replacement
£325,763
works
Contract Details
- Tender Value
- £325,763
- Stage
- Live
- Published
- Awarded
Timeline
Start
Awarded
Disclosed
End
Description
The Mill Leese Flood Storage Area (FSA) is located in Saltwood, Hythe, Kent (CT21 4QU). It forms part of the Hythe Protection Scheme. The overall objective of this project is to replace the existing fence and access gates to a more robust design with a minimum design life of 25 years. The recommended and preferred solution from the ESE is a steel post and panel fence constructed on the flat downstream and upstream toes of the embankment and a steel post and straining wire fence on the slopes. This hybrid solution will meet all project objectives.
Related Contracts
From This Supplier
- South East - SE Recondition Programme - Denton and Higham Pre-construction package
£70,374 ·
- SE - KSL AOMR Lot 1 - Avebury Ave Flood Defence Appraisal (Avebury Pile Repair)
£58,755 ·
- KSL - AOMR - Sutcliffe Park Reservoir Crest Works Ground Investigation
£69,153 ·
- KSL - AOMR - Sutcliffe Park Reservoir Maintenance
£171,720 ·
In This Category
- CBC-2087-Q-SM Wet Floor Shower Delivery - AWARD
£0 ·
- Core Hole Drilling
£132,000 ·
- Cyclical Decoration Works Contract
£560,000 ·
- Surface Works throughout Taunton
£70,000 ·
Ref: d8f27129-270d-4f3f-997f-5ce844c09bb2-876993 · Sourced from Contracts Finder
View source notice